It’s all about covering the ENTIRE floor from the different hose connections on 
that level (100ft hose + 30 ft throw).

Roland

Roland Huggins, PE - Senior VP Engineering
American Fire Sprinkler Assn.    
Dallas, TX
http://www.firesprinkler.org <http://www.firesprinkler.org/>

Fire Sprinklers Saves Lives




> On May 22, 2017, at 10:50 AM, Bob <[email protected]> wrote:
> 
> I have a stairway that has no access to the 1st floor, but it does exit to 
> the outside of building.  
> The ANNEX material shows a hose valve located with respect to the floor 
> access, since there is no floor access would the hose valve be required for 
> this level?
>  
> Thank you,
>  
> Bob Knight, CET III
> 208-318-3057
> <image001.jpg>
>  
> _______________________________________________
> Sprinklerforum mailing list
> [email protected] 
> <mailto:[email protected]>
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org 
> <http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to