It’s all about covering the ENTIRE floor from the different hose connections on that level (100ft hose + 30 ft throw).
Roland Roland Huggins, PE - Senior VP Engineering American Fire Sprinkler Assn. Dallas, TX http://www.firesprinkler.org <http://www.firesprinkler.org/> Fire Sprinklers Saves Lives > On May 22, 2017, at 10:50 AM, Bob <[email protected]> wrote: > > I have a stairway that has no access to the 1st floor, but it does exit to > the outside of building. > The ANNEX material shows a hose valve located with respect to the floor > access, since there is no floor access would the hose valve be required for > this level? > > Thank you, > > Bob Knight, CET III > 208-318-3057 > <image001.jpg> > > _______________________________________________ > Sprinklerforum mailing list > [email protected] > <mailto:[email protected]> > http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org > <http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org>
_______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
