NFPA 14, 2010, 7.2.4 (4) requires a bypass across a prv. Is it only when
multiple smaller prv's are used instead of a larger prv, or whenever any
prv is used?

My application is there is a prv at the floor control stations supplying
combined sprinkler/standpipe. Would this prv need a by-pass?

The other question is will every prv need control valves upstream and
downstream?

I know it is good engineering practice to have the valves and by-pass, but
very often there is not much space inside the stairs. What is the general
industry practice?

Thanks,

Tony