How do you approach unprotected areas in regards to ITM and NFPA 25. I know 
there was a discussion in the past regarding inspecting a system as is, rather 
than writing up deficiencies that have to do with system design. I have been 
told that this can open up more liability if you are not inspecting all design 
elements (i.e. density, hazard levels, etc.)

Thank you!