Dear Sprinkler Forum Representative, The question I have today is pertaining to "balancing" in-rack sprinkler output with that of the ceiling output in a high-risk commodity application. I am using SprinkCAD within AutoCAD for this project, and I believe that the only way for me to run the calculation is with two separate calcs; however, I understand that the fire scenario would be such that the in-racks would need to operate simultaneously with the ceiling sprinklers. I assume that to represent this within calcs, I would need to modify the input criteria for the two separate calcs such that the outputs are adjusted as representative of simultaneous discharge. Towards this end, what strategy should one use for generating this balance across the two separate design areas?
I look forward to your reply. Kindly, Lawrence
_________________________________________________________ SprinklerForum mailing list: https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org To unsubscribe send an email to [email protected]
