Dear Sprinkler Forum Representative,

The question I have today is pertaining to "balancing" in-rack sprinkler output 
with that of the ceiling output in a high-risk commodity application. I am 
using SprinkCAD within AutoCAD for this project, and I believe that the only 
way for me to run the calculation is with two separate calcs; however, I 
understand that the fire scenario would be such that the in-racks would need to 
operate simultaneously with the ceiling sprinklers. I assume that to represent 
this within calcs, I would need to modify the input criteria for the two 
separate calcs such that the outputs are adjusted as representative of 
simultaneous discharge. Towards this end, what strategy should one use for 
generating this balance across the two separate design areas?

I look forward to your reply.

Kindly,
Lawrence
_________________________________________________________
SprinklerForum mailing list:
https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org
To unsubscribe send an email to [email protected]

Reply via email to