Robert Collins wrote:
On Wed, 2010-01-27 at 22:49 -0700, Alex Rousskov wrote:
c) Co-Advisor currently only tests MUST-level requirements. Old Robert's
checklist contained some SHOULD-level requirements as well. I see that
Sheet1 on the spreadsheet has SHOULDs. Are we kind of ignoring them (and
Sheet1) for now, until all MUSTs on Sheet2 are satisfied?
d) I do not know who created the spreadsheet. Whoever it was, thank you!
Is there a script that takes Co-Advisor results and produces a
spreadsheet column for cut-and-pasting?
It looks nice. It might be based on the xls spreadsheet I made, but I
don't know ;)
I would not worry about SHOULD's until the MUSTs are done (but if a
SHOULD is in reach while doing a MUST, doing it would be good).
-Rob
Spreadsheet by me. Item format + naming by the Co-Advisor authors. Data
by Y! testing + me for the estimated column.
I tried to base it on yours Rob for a historical view of the 2.x
support. But the item naming and crossover was too different and too
much work to be reliable and easy. half-sorry ;)
Alex: the current form is effectively a XLS dump cross-test of the
Co-Advisor results. Plus manual estimations for the "guess" column.
I've forgotten what was on the Sheet2. So yes it's missed a few rounds
of updates.
Amos
--
Please be using
Current Stable Squid 2.7.STABLE7 or 3.0.STABLE21
Current Beta Squid 3.1.0.15