Robb,

 Thanks for the info,

Looks great,  it sure deserved the  honor of Tom's  Flying Scotsman!!  Can
I ask what coaches the FS is pulling?
Thanks
Geoff


I am behind on reading my email.
>On the track damage in transport issue I borrowed from my days in N-trak
>and use a 12" section of track at the table joints. This keeps the end
>of the flex track back from the edge. I have had no damage to the end of
>the track.  My track has 2 meter radius curves and set up measures 15' X
>25'.  Each curve is made up of three pieces 10" wide with an eight foot
>straight section in the middle that is 2' wide.  For transport I bolt
>two sections track to track.  It fits in a full size pickup or small
>trailer.  I can set it up in one hour.
>
>http://www.johnsgardenrailway.com/images/Steam-ups/Devries-2003/BAGRS_small.JPG
>
>http://www.johnsgardenrailway.com/images/Steam-ups/Devries-2003/TomsFlyingScots
>man2.JPG
>
>This years steamup is fast approaching (June 19).  If anyone wants to
>steam in West Michigan let me know.
>Robb
>
>
>
>Gary wrote:
>> Our club had to scrap our portable aluminum track system because of
>> transportation damage that always occurred to track.
>


 

Reply via email to