Compatibility of the proposal:
#Relations:
* with two relations per line: merging relations is necessary
* with one relation per line: 100% compatibility; if the existing lines
contain roles, they would be ignored
#Bus stops:
* with bus stops: 100% compatibility with existing bus stops which are
mapped at the location of the pole; however for future routing purposes
all bus stops would have to be added to line relations, and all stops
must be updated with backward_stop and forward_stop tag *)
* with bus stops placed at the center of the road: change of location
and/or tag may be necessary (/this needs to be cleaned up anyway, in
another thread it was agreed that stops should be mapped in their actual
location/)
# Tram/metro/light rail stops
* those stops lacking platforms/poles will require updates *)
*) upgrades are only necessary if routing software is to be implemented
# Amenity=bus_station and stop_area:
* to be discussed
Greetings,
LMB
_______________________________________________
Talk-transit mailing list
Talk-transit@openstreetmap.org
http://lists.openstreetmap.org/listinfo/talk-transit