Compatibility of the proposal:

#Relations:
* with two relations per line: merging relations is necessary
* with one relation per line: 100% compatibility; if the existing lines contain roles, they would be ignored


#Bus stops:
* with bus stops: 100% compatibility with existing bus stops which are mapped at the location of the pole; however for future routing purposes all bus stops would have to be added to line relations, and all stops must be updated with backward_stop and forward_stop tag *)

* with bus stops placed at the center of the road: change of location and/or tag may be necessary (/this needs to be cleaned up anyway, in another thread it was agreed that stops should be mapped in their actual location/)


# Tram/metro/light rail stops
* those stops lacking platforms/poles will require updates *)

*) upgrades are only necessary if routing software is to be implemented


# Amenity=bus_station and stop_area:

* to be discussed


Greetings,
LMB


_______________________________________________
Talk-transit mailing list
Talk-transit@openstreetmap.org
http://lists.openstreetmap.org/listinfo/talk-transit

Reply via email to