Hi when i add or remove an operator in the job graph , using savepoint i must cancel the job to be able run the new graph
e.g. by adding or removing operator (like new sink target) it was working in the past i using flink 1.17.1 1. is it a known bug? if so when planned to be fix 2. do i need to do something to make it work? nick