--- Transrapid International <[EMAIL PROTECTED]> in USMA 245291 wrote:

 in the superspeed Transrapid maglev system.

 > The track gauge is 2.8 m, the guideway pitch depends
 on the speed of the
 trains (< 300 km/h: 4.4 m, < 400 km/h: 4.8 m, < 500
 > km/h: 5.1 m).


Can anyone explain what "guideway pitch" is?
--
Joseph B. Reid
17 Glebe Road West
Toronto  M5P 1C8		Telephone 416-486-6071

Reply via email to