--- Transrapid International <[EMAIL PROTECTED]> in USMA 245291 wrote:
in the superspeed Transrapid maglev system. > The track gauge is 2.8 m, the guideway pitch dependson the speed of the trains (< 300 km/h: 4.4 m, < 400 km/h: 4.8 m, < 500> km/h: 5.1 m).
Can anyone explain what "guideway pitch" is? -- Joseph B. Reid 17 Glebe Road West Toronto M5P 1C8 Telephone 416-486-6071
