Hi Ben and all - As you probably know, Keysight is still selling new 3458As,  
"Starting From US$ 9,586"

Regards,  John, K1AE

-----Original Message-----
From: volt-nuts [mailto:volt-nuts-boun...@febo.com] On Behalf Of ben
Sent: Sunday, May 03, 2015 8:47 AM
To: Discussion of precise voltage measurement
Subject: Re: [volt-nuts] "*WAY* too expensive for even Keysight to redesign"

Hello,

I note lots of Defence procedures used in their metrology labs still 
require a 3458A as a core item, even for more mundane measurements. Defence 
seemingly are not switching over to newer voltmeters, or writing out the 
need for a 3458A. While defence are still maintaining old platforms it 
makes sense to them in keeping the originally specified test equipment in 
the relevant procedure - so long as HP keeps supporting the 3458A.

ben


-------- Original Message --------
> From: "Poul-Henning Kamp" <p...@phk.freebsd.dk>
> Sent: Sunday, May 03, 2015 4:58 PM
> To: "Discussion of precise voltage measurement" <volt-nuts@febo.com>, 
"Jan Fredriksson" <j...@41hz.com>
> Subject: Re: [volt-nuts] "*WAY* too expensive for even Keysight to 
redesign"
> 
> --------
> In message 
<cafownwcwaz3f931thbhx+e2otvt+hbpq3rxtd+gomm9uibs...@mail.gmail.com>
> , Jan Fredriksson writes:
> 
> >> Could you say a bit more about this? Did the 3458A not make
> >>economic sense for HP at the time? Is nobody buying 8.5s these days?
> 
> It's an interesting historical confluence:  8.5's are the clippers of 
DVMs.
> 
> 8.5 only makes sense two places: fundamental/high-end metrology
> and basic research.
> 
> Everybody else are totally fine with 7.5 and very few actually need
> more than 6.5 (specifying the temperature of your aligator-clips
> gets old really fast.)
> 
> The 3458A made it possible to validate the josephson junction as
> SI voltage reference -- which ironically made the 3458A surplus to
> metrology requirements:  Now you can generate any voltage you want
> on demand.
> 
> That leaves a theoretical market in basic research, but that's a
> very small market which will happily pay a phd-theses for a prototype,
> but unless its on CERN scale, production runs are never an option.
> 
> -- 
> Poul-Henning Kamp       | UNIX since Zilog Zeus 3.20
> p...@freebsd.org         | TCP/IP since RFC 956
> FreeBSD committer       | BSD since 4.3-tahoe    
> Never attribute to malice what can adequately be explained by 
incompetence.
> _______________________________________________
> volt-nuts mailing list -- volt-nuts@febo.com
> To unsubscribe, go to 
https://www.febo.com/cgi-bin/mailman/listinfo/volt-nuts
> and follow the instructions there. 


_______________________________________________
volt-nuts mailing list -- volt-nuts@febo.com
To unsubscribe, go to https://www.febo.com/cgi-bin/mailman/listinfo/volt-nuts
and follow the instructions there.


---
This email has been checked for viruses by Avast antivirus software.
http://www.avast.com

_______________________________________________
volt-nuts mailing list -- volt-nuts@febo.com
To unsubscribe, go to https://www.febo.com/cgi-bin/mailman/listinfo/volt-nuts
and follow the instructions there.

Reply via email to