I'm with Robert L. I don't think you will ever be offered a test. But if you are, I'll be happy to talk with you by phone and make very detailed suggestions for making sure your tests are valid --if you'd like.
The first and foremost suggestion is to allow Rossi to supply NOTHING except the E-cat and maybe the frequency generator whatever that is-- ABSOLUTELY NOTHING. I can't emphasize that too much. You will need to plan for your own power supply (Rossi to supply specifications), power input measuring equipment, coolant circuit -- keep it liquid-- no steam, no heat exchanger-- and all your own flow meters and temperature measuring devices. More details if you actually get a scheduled appointment for the test-- as much detail as you need. YOU not Rossi will need to decide how long to run and you will need enough people to make sure it goes several days or more. I was tempted to do this myself (order a 100 kW machine) but I don't really need to tie up $200K for a long time and I don't think Rossi is really selling the E-cats. One interesting detail -- what is the "frequencies" device and who provides that but it doesn't matter where that comes from as long as you check what's in it, and most of all, it's electrical power consumption. Good going. I hope you get an E-cat. I doubt that you will.