+1
We just did a rural road with the 12F drop direct bury. With creative splitting, I was able to get the 50-60 lots covered. Still have room on the fiber if needed.
--
Best regards,
Mark mailto:m...@mailmt.com
Myakka Technologies, Inc.
www.MyakkaTech.com
------
Friday, March 1, 2019, 11:00:48 AM, you wrote:
We do fiber in 5-20 houses per mile areas. You have to get the cost down as much as possible. We plow most of our mainline direct buried, often use a 12-count tonable flat drop as mainline on side roads. With the right GPON splitting topology you can feed several hundred houses on a 12-count fiber. If the area is rural enough to not have a lot of paved driveways you can cover a lot of ground fast plowing. Cheap electronics like ZTE or UBNT. Everythign fusion spliced because splicing labor is cheaper for us than the fancy connectorized systems. Permitting cost will vary by area, our costs are $500 for the first mile and $50 per additional mile, one time fee. On Fri, Mar 1, 2019 at 10:54 AM Matt Hoppes <mattli...@rivervalleyinternet.net> wrote:
|
-- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com