Yes, that is our understanding.

David Coudron
david.coud...@advantenon.com  |  Mobile: 612-991-7474
 
Advantenon, Inc.            
i...@advantenon.com  |  3500 Vicksburg Lane N, Suite 315, Plymouth, MN 55447  | 
 www.advantenon.com  |  Phone: 800-704-4720  |  Local: 612-454-1545 



-----Original Message-----
From: AF <af-boun...@af.afmug.com> On Behalf Of Seth Mattinen
Sent: Monday, January 27, 2020 10:33 AM
To: af@af.afmug.com
Subject: Re: [AFMUG] FCC 3.5 GHz Spectrum Auction 105

On 1/27/20 7:20 AM, Mark Radabaugh wrote:
> yep, and a self fulfilling failure on the part of the FCC.    The FCC 
> looked at the registered CPE and decided that WISP’s were not using 
> the band without ever considering how badly they fubared the entire 
> registration process.
> 
> You WISP’s don’t need an extension, you didn’t use the band.   Uh, yeah.
> 


Is the NN shutdown date still April 17, 2020?

--
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com
-- 
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to