On Wed, Nov 23, 2016 at 7:39 PM, Philip Race <philip.r...@oracle.com> wrote:

> We have a PIT (pre-integration-testing process) but if
> that these clashes are presented only as an FYI and not
> an actual failure then SQE might not notice it. It may
> even get swallowed and not forwarded for human inspection
> by some layered tool on top.
> I don't actually know .. I am just speculating.
>

I do know that the awt clash caused my jtreg command to exit with a
non-zero return code, which causes my own little integration pipeline to
come to a halt (as it should!).

So your PIT process should be checked to ensure that a jtreg regression
cannot slip through.

Reply via email to