Document: draft-ietf-bess-evpn-bfd
Title: EVPN Network Layer Fault Management
Reviewer: Vijay Gurbani
Review result: Ready with Nits

I am the assigned Gen-ART reviewer for this draft. The General Area
Review Team (Gen-ART) reviews all IETF documents being processed
by the IESG for the IETF Chair.  Please treat these comments just
like any other last call comments.

For more information, please see the FAQ at

<https://wiki.ietf.org/en/group/gen/GenArtFAQ>.

Document: draft-ietf-bess-evpn-bfd-10
Reviewer: Vijay K. Gurbani
Review Date: 2025-05-20
IETF LC End Date: Not known
IESG Telechat date: Not scheduled for a telechat

Summary: This I-D is ready to be published as a standards document.

Major issues: 0

Minor issues: 0

Nits: 3

Nits:
1. Section 1: s/that is to say between/that is, between/
2. Section 3: "Continuity testing at each layer SHOULD, if possible,..." Here,
isn't the "if possible" redundant?  After all, then normative strength is
SHOULD which loosely implies "if possible". 3. Section 7: "...could affect the
packet load on the network..." Would it be possible to expand on how could the
document affect the packet load on the network?  For instance, is the network
affected because the packet size becomes large, and therefore requires more
processing at the endpoints and intermediaries?  Or is the network load
affected due the expected large number of EVIs once this standard is
implemented?  Or are there other reasons inherent in the implementation of the
document that would increase the network load?



_______________________________________________
BESS mailing list -- bess@ietf.org
To unsubscribe send an email to bess-le...@ietf.org

Reply via email to