if you are running ppp encapsulation over those two lines (which you should consider) you can run a multilink (go to cco and do search on configuring virtual templates), and have a full pipe of 3 mb. other way is to run one of the routing protocols, whichever you want. Dragi Message Posted at: http://www.groupstudy.com/form/read.php?f=7&i=7725&t=7687 -------------------------------------------------- FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]
- Load Sharing of 2 Serial on 2501 [7:7687] Tay Chee Yong
- RE: Load Sharing of 2 Serial on 2501 [7:7687] Remmert Veen
- RE: Load Sharing of 2 Serial on 2501 [7:7687] dragi radovanovic
- RE: Load Sharing of 2 Serial on 2501 [7:7687] dragi radovanovic
- RE: Load Sharing of 2 Serial on 2501 [7:7687] Tay Chee Yong
- Re: Load Sharing of 2 Serial on 2501 [7:7687] Rashid Lohiya
- Re: Load Sharing of 2 Serial on 2501 [7:7687] Michael L. Williams
- Re: Load Sharing of 2 Serial on 2501 [7:7687] Tony Medeiros
- Re: Load Sharing of 2 Serial on 2501 [7:7687] Brian
- Re: Load Sharing of 2 Serial on 2501 [7:7687] Tay Chee Yong
- Re: Load Sharing of 2 Serial on 2501 [7:7687] [EMAIL PROTECTED]