Working backwards and allowing a little time for slip: Nov 1: Planned final RC tarball for release of 2.2.0
Oct 1: Code freeze of all new features in 2.1-dev (for a month till we
branch head to 2.2.0 and bless HEAD as 2.3-dev)
Thoughts?
Bill
