On Fri, 10 Dec 2010 15:21:38 -0500, Jonathan M Davis <[email protected]> wrote:


Would it be better if I changed the IRange functions so that rather than
returning a delegate, they took an interval and returned the range? So, rather
than

auto interval = Interval!Date(Date(2010, 9, 2), Date(2010, 9, 27));
auto func = IRange.everyDayOfWeek!Date(DayOfWeek.fri);
auto range = interval.fwdRange(func);


you'd get something like

auto interval = Interval!Date(Date(2010, 9, 2), Date(2010, 9, 27));
auto range = IRange.everyDayOfWeek!Date(interval, DayOfWeek.fri);

Then you wouldn't have to give the IRange function Direction.fwd or
Direction.bwd (well, just Direction.bwd, since fwd is the default) then pass that it to fwdRange() or bwdRange() and have to worry about whether you screwed up and mismatched the directions. It would then be caught at compile time rather
than runtime.

fwdRange() and bwdRange() would stay the same, but you wouldn't have to call the
directly unless you were writing your own delegate.

Does that seem like a big improvement to you? After thinking of about the
problem further and coming up with that change, I'm definitely considering making
it.

When I looked at the code, I didn't pay much attention to the range stuff.

But you really need to incorporate IFTI here. It would be much nicer if you did:

auto ival = interval(Date(2010, 9, 2), Date(2010, 9, 27);
auto range = everyDayOfWeek(ival, DayOfWeek.fri);

At least that's a start, we should be able to build more wrappers to reduce the verbosity:.

auto range = everyDayOfWeek(Date(2010, 9, 2), Date(2010, 9, 27), DayOfWeek.fri);

Some way to use slice syntax might be nice.  perhaps:

auto range = Date["9/2/2010".."9/27/2010"].every(DayOfWeek.fri);

maybe that last one is just a pipe dream ;)

-Steve

Reply via email to