http://www.ieee-pses.org/symposium http://www.emc2004.org/ --------------------------------------------------
Gary Believe it or not, we had a customer who sent a complex comms system to Turkey. The Customs stopped it and would not let it through until they were provided with the Technical Construction File, not just the DoC! Note: Turkey has implemented almost all EU Directives as part of its programme to join the EU - and they seem to enforce them. John -----Original Message----- From: Gary McInturff [ mailto:[email protected]] Sent: 04 August 2004 16:08 To: '[email protected]'; [email protected] Subject: RE: IEC and the CB Scheme http://www.ieee-pses.org/symposium http://www.emc2004.org/ -------------------------------------------------- I've never been stopped due to a lack of test reports - or the technical construction file for that matter. Only when the manufacturing site forgot to apply the CE mark et all and the DoC didn't get included in the shipment. The tests, file, and all of the necessary approval steps HAD already been completed - there was just a small paperwork screw-up in apply the appropriate marks. In fact when stopped it only took a few days to get the DoC to the authorities and off it went. (I still don't remember sending the test reports etc - but its been awhile) Gary -----Original Message----- From: [email protected] [ mailto:[email protected]] Sent: Wednesday, August 04, 2004 4:54 AM To: [email protected] Subject: RE: IEC and the CB Scheme http://www.ieee-pses.org/symposium http://www.emc2004.org/ -------------------------------------------------- > I have had numerous occasions where a manufacturer is in "panic" mode > and needed their product tested for CE (yes, within a few days), because they have done nothing about it and have been stopped by Europewan customs. What was the legal ground to stop products due to lack of test results (reports)? Just curious. John Radomski peter merguerian <pmerguerian2001@yaho To: "Brian O'Connell" <[email protected]>, peter merguerian o.com> <[email protected]>, Dan Anchondo <[email protected]>, [email protected] Sent by: cc: owner-emc-pstc@listse Subject: RE: IEC and the CB Scheme rv.ieee.org 08/04/2004 12:49 AM http://www.ieee-pses.org/symposium http://www.emc2004.org/ -------------------------------------------------- Brian, What is a CE Test Report? It is one that the manufacturer has gathered, either in-house or externally, to determine the product is CE compliant. Remember you can go to any laboratory that meets your criteria of a test lab (my strong recommendation is to ensure it is one that is accredited to ISO 17025). Also note that the CE documentation (EMC, safety, etc.) must be available within 10 days after the manufacturer or importer is requested to do so by the European authorities. I have had numerous occasions where a manufacturer is in "panic" mode and needed their product tested for CE (yes, within a few days), because they have done nothing about it and have been stopped by Europewan customs. Best Regards, Peter Merguerian Brian O'Connell <[email protected]> wrote: http://www.ieee-pses.org/symposium http://www.emc2004.org/ -------------------------------------------------- What is a "CE Test Report" ? thanks, Brian -----Original Message----- From: peter merguerian [ mailto:[email protected]] Sent: Saturday, July 31, 2004 12:28 AM To: Dan Anchondo; [email protected] Subject: Re: IEC and the CB Scheme Hello Dan, No, a CB Test Report is not required to make a European CE Declaration. Typically for CE, the manufacturer gets his product tested in his own accredited laboratory or at a third party laboratory and declares compliance with all the applicable Directives. The CB Test Report is not only for power supplies. You can get a CB to many categories including but not limited to: Household Appliances IEC60335 , Lasers (IEC825), ITE (IEC60950), Laboratory Measurement and Test Equipment (IEC61010), etc. etc. A CB Test Report allows you to test the product at one NCB appointed by the IEC in a particular country (say TUV Rheinland of North America) such that the test results are accepted by another NCB in another country (such as SII in Israel). Remember, Test Results only are usually accepted. However, some NCBs such as TUV Rheinland of North America have excellent rapports with various test agencies in the world, such that not only the test results are accepted but also the construction. By the way, you can cover the power supply and product in the same CB Test Report. Why pay the expense of doing two reports? A CB Test Report is not much more expensive than doing just a CE Test Report. For IEC60950-1, there are 25 countries participating countries - however, there are other countries who either are not an IEC member or have missed being in the Technical Bulletin, but who still accept CB Test Reports. If you have any other questions regarding CE, CB, GS, cTUVus Listing/Recognition/Clasification, Wi-Fi, NEBS, Ergonomics, ISO9000, Machinery, Household Appliances, Audio/Video Appliances, Luminaires, Telecoms, Pressure Vessels, Medical, Telecoms, NOM (Mexico), CCC (China), S Mark (Argentina), GOST (Russia) etc., let me know either privately or via the emc-pstc list. Regards, Peter Merguerian ------------------------------------------- This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. IEEE PSES Main Website: http://www.ieee-pses.org/ To post a message send your e-mail to [email protected] Instructions for use of the list server: http://listserv.ieee.org/listserv/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Ron Pickard: [email protected] Dave Heald: [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc Do you Yahoo!? Y! Messenger - Communicate in real time. Download now. ------------------------------------------- This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. IEEE PSES Main Website: http://www.ieee-pses.org/ To post a message send your e-mail to [email protected] Instructions for use of the list server: http://listserv.ieee.org/listserv/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Ron Pickard: [email protected] Dave Heald: [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc ------------------------------------------- This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. IEEE PSES Main Website: http://www.ieee-pses.org/ To post a message send your e-mail to [email protected] Instructions for use of the list server: http://listserv.ieee.org/listserv/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Ron Pickard: [email protected] Dave Heald: [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc ------------------------------------------- This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. IEEE PSES Main Website: http://www.ieee-pses.org/ To post a message send your e-mail to [email protected] Instructions for use of the list server: http://listserv.ieee.org/listserv/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Ron Pickard: [email protected] Dave Heald: [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc _____________________________________________________________________ This e-mail has been scanned for viruses by MCI's Internet Managed Scanning Services - powered by MessageLabs. For further information visit http://www.mci.com ********************************************************************** Copyright ERA Technology Ltd. 2004. (www.era.co.uk). All rights reserved. The information supplied in this Commercial Communication should be treated in confidence. No liability whatsoever is accepted for any loss or damage suffered as a result of accessing this message or any attachments. ********************************************************************** _____________________________________________________________________ This e-mail has been scanned for viruses by MCI's Internet Managed Scanning Services - powered by MessageLabs. For further information visit http://www.mci.com ------------------------------------------- This message is from the IEEE Product Safety Engineering Society emc-pstc discussion list. IEEE PSES Main Website: http://www.ieee-pses.org/ To post a message send your e-mail to [email protected] Instructions for use of the list server: http://listserv.ieee.org/listserv/request/user-guide.html List rules: http://www.ieee-pses.org/listrules.html For help, send mail to the list administrators: Ron Pickard: [email protected] Dave Heald: [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://www.ieeecommunities.org/emc-pstc

