2009/5/1 Chris Meller <[email protected]>:
> My "problem" is that we already have a basic roadmap of things we'd like to
> get into each release up to 1.0. 1.0 is a big thing in the *nix world, so it
> seems like once we get there we should have most of these things
> accomplished.
>
> If we wait and put out 0.7 next month with 2 new features, then 0.8 two
> months later with another 3 we end up at 1.0 a lot sooner than I think most
> of us would like.

It's a separator, not a decimal place. 0.7 -> 0.8 -> 0.9 -> 0.10 ->
0.11 -> whatever ->1.0

It doesn't make sense to force a major point release because of version numbers.

-- 
Michael C. Harris, School of CS&IT, RMIT University
http://twofishcreative.com/michael/blog
IRC: michaeltwofish #habari

--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at http://groups.google.com/group/habari-dev
-~----------~----~----~----~------~----~------~--~---

Reply via email to