2009/5/1 Chris Meller <[email protected]>: > My "problem" is that we already have a basic roadmap of things we'd like to > get into each release up to 1.0. 1.0 is a big thing in the *nix world, so it > seems like once we get there we should have most of these things > accomplished. > > If we wait and put out 0.7 next month with 2 new features, then 0.8 two > months later with another 3 we end up at 1.0 a lot sooner than I think most > of us would like.
It's a separator, not a decimal place. 0.7 -> 0.8 -> 0.9 -> 0.10 -> 0.11 -> whatever ->1.0 It doesn't make sense to force a major point release because of version numbers. -- Michael C. Harris, School of CS&IT, RMIT University http://twofishcreative.com/michael/blog IRC: michaeltwofish #habari --~--~---------~--~----~------------~-------~--~----~ To post to this group, send email to [email protected] To unsubscribe from this group, send email to [email protected] For more options, visit this group at http://groups.google.com/group/habari-dev -~----------~----~----~----~------~----~------~--~---
