The last time I checked, adding an LPAR still requires a full power on
reset. Like any LPAR, it will need resources such as main memory to be
allocated. 

Perhaps you'd want to look at a VM based solution. 

-----Original Message-----
From: IBM Mainframe Discussion List [mailto:[EMAIL PROTECTED] On
Behalf Of Tommy Tsui
Sent: Friday, November 07, 2008 5:17 AM
To: IBM-MAIN@BAMA.UA.EDU
Subject: good practise to run linux on mainframe

Hi all,

Is there any shop running zlinux/zVM on mainframe z9/z10. How the setup
or
any pre-requisite required for mainframe. Currently our z9 is 2094-707
running on 7 production LPARs and 2 development LPARs. Is there any
harmful
or risk to add one more LPAR with IFL to running LINUX. (different OS).
Any
shop have the same configuration? By the way, any reference/red book
teach
how to setup and tuning?

Any comment will be appreciated

thanks and regards

 

NOTICE: This electronic mail message and any files transmitted with it are 
intended
exclusively for the individual or entity to which it is addressed. The message, 
together with any attachment, may contain confidential and/or privileged 
information.
Any unauthorized review, use, printing, saving, copying, disclosure or 
distribution 
is strictly prohibited. If you have received this message in error, please 
immediately advise the sender by reply email and delete all copies.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to