Here's what I do:

 

1)                   Apply Maintenance to production system

2)                   Flash production DASD to test packs (using
different naming conventions)
Actually, I have a REXX program I wrote that not only changes the name,
but updates the SYSTEM CONFIG, directory and updates the directory on
the test packs.

3)                   Bring up the 2nd level VM

4)                   Run PUT2PROD on 2nd level

5)                   Test 2nd level

 

If satisfied with the testing:

 

1)                   Flash production DASD to backup packs (can be the
same as the test packs, again using a different naming convention)

2)                   PUT2PROD on the production system

3)                   IPL the updated system

4)                   Any problems, I can immediately IPL the "backup"
system (copy prior to PUT2PROD)

 

 

 

Frank M. Ramaekers Jr.

 

 

________________________________

From: The IBM z/VM Operating System [mailto:ib...@listserv.uark.edu] On
Behalf Of George Henke/NYLIC
Sent: Friday, September 24, 2010 9:02 AM
To: IBMVM@LISTSERV.UARK.EDU
Subject: Re: Applying Maintenance - Best Practice

 


Is there a procedure for applying maintenance selectively such that  a
full system backup is not necessary beforehand? 

In other words, save the old CPLOAD and just point to the new CPLOAD at
IPL and if need be simply fallback to the old CPLOAD. 

I know the CF1 Parm Disk backup supports this. 

But is there a way of applying maintenance so that it hits only a new
CPLOAD and not  the current CPLOAD. 

Perhaps the answer is to save the current CPLOAD in the CF1 Parm Disk
configuration before applying the maintenance. 

It is probably not "best practice", but is there such a procedure of
avoiding a full system backup before putting on any maintenance, or is
that taboo? 




Marcy Cortes <marcy.d.cor...@wellsfargo.com> 
Sent by: The IBM z/VM Operating System <IBMVM@LISTSERV.UARK.EDU> 

09/23/2010 04:00 PM 

Please respond to
The IBM z/VM Operating System <IBMVM@LISTSERV.UARK.EDU>

To

IBMVM@LISTSERV.UARK.EDU 

cc

 

Subject

Re: Applying Maintenance - Best Practice

 

 

 




We put it on 2nd level first.  Check that it IPLs, basically... not a
lot we can do there.
Then our vm test lpar.  Make sure everything comes up.  Maybe start a
Linux there.
Then our 2 Linux test/dev lpars, which run lots of servers.  Gets a lot
of exercise there.
Let it cook a few weeks.
Roll to the 6 production LPARs, starting usually with the 2 that don't
run Linux.  Then 2 Linux on a weekend and the other 2 on another
weekend.

We have the z196 maint with RSU 1002 on all of test dev now (3 lpars).
On both a z196 and a z10.   All is well, YMMV;)

Marcy

________________________________

From: The IBM z/VM Operating System [mailto:ib...@listserv.uark.edu] On
Behalf Of George Henke/NYLIC
Sent: Thursday, September 23, 2010 10:58 AM
To: IBMVM@LISTSERV.UARK.EDU
Subject: Re: [IBMVM] Applying Maintenance - Best Practice



I suppose RSU maintenance gets burned-in at Level 2, whereas COR
maintenance goes right in to Level 1. 

But , what bout PSP COR?  Level 1 or Level 2. 





Scott Rohling <scott.rohl...@gmail.com> 
Sent by: The IBM z/VM Operating System <IBMVM@LISTSERV.UARK.EDU> 

09/23/2010 10:58 AM 
Please respond to
The IBM z/VM Operating System <IBMVM@LISTSERV.UARK.EDU>


To
                IBMVM@LISTSERV.UARK.EDU 
cc
                
Subject
                Re: Applying Maintenance - Best Practice

                




I'd say it depends on the purpose of your 2nd level system.    Do what
you would normally do when applying maintenance...  do you put it on 1st
or 2nd level first?   If your 2nd level system is meant to be a z/VM
'test' system, then it seems like you're already committed to that level
of effort.

Scott Rohling

On Thu, Sep 23, 2010 at 8:30 AM, George Henke/NYLIC
<george_he...@newyorklife.com <mailto:george_he...@newyorklife.com> >
wrote: 

Would you recommend putting this 5.4 zEnterprise compatibility
maintenance on at Level 1 or Level 2. 

We currently have both environments for 5.4. 

I suppose the quickest and easiest (maybe dirtiest too?) way is just to
put it on at Level 1 and fall back to CPOLD if there is a problem. 

"Best practice" may call for putting it on at Level 2 first, but the
nature of the change may not warrant that level of effort. 

There are, however, 45 or more prereq fixes also going on with these 2
APARs,  VM64879 VM64881. 

Just interested in what everyone thinks. 

 


Marcy Cortes <marcy.d.cor...@wellsfargo.com <
<mailto:george_he...@newyorklife.com>
mailto:marcy.d.cor...@wellsfargo.com> > 
Sent by: The IBM z/VM Operating System <IBMVM@LISTSERV.UARK.EDU <
<mailto:marcy.d.cor...@wellsfargo.com> mailto:IBMVM@LISTSERV.UARK.EDU> >


09/22/2010 11:01 AM 



Please respond to
The IBM z/VM Operating System <IBMVM@LISTSERV.UARK.EDU <
<mailto:IBMVM@LISTSERV.UARK.EDU> mailto:IBMVM@LISTSERV.UARK.EDU> >


To
                IBMVM@LISTSERV.UARK.EDU <
<mailto:IBMVM@LISTSERV.UARK.EDU> mailto:IBMVM@LISTSERV.UARK.EDU>  
cc
                
Subject
                Re: What is the z/VM 5.4 Compatibility PTF for z196?


                





Also you want to check PSP on IBMLink and look for 2817DEVICE and see
what recent stuff is needed for that system type (or whatever one you
are installing).

________________________________

From: The IBM z/VM Operating System [mailto:IBMVM@LISTSERV.UARK.EDU <
<mailto:IBMVM@LISTSERV.UARK.EDU> mailto:IBMVM@LISTSERV.UARK.EDU> ] On
Behalf Of Bruce Hayden
Sent: Wednesday, September 22, 2010 7:27 AM
To: IBMVM@LISTSERV.UARK.EDU < <mailto:IBMVM@LISTSERV.UARK.EDU>
mailto:IBMVM@LISTSERV.UARK.EDU> 
Subject: Re: [IBMVM] What is the z/VM 5.4 Compatibility PTF for z196?


Look at the page <mailto:IBMVM@LISTSERV.UARK.EDU>
http://www.vm.ibm.com/service/vmreqze.html for the complete list of z/VM
APARS for the zEnterprise.


On Wed, Sep 22, 2010 at 10:07 AM, George Henke/NYLIC
<george_he...@newyorklife.com> wrote:



               Marcy, 
               
               Thank you for this information. 
               
               Do you happen to know what PTF is needed to run z/VM 5.4
on the z196. 
               
               We will probably take your advice. 
               
               We will probably bring up the z196 with 5.4 first and
then move 6.1 up to Level 1 afterwards. 
               
                                                 


-- 
Bruce Hayden
z/VM and Linux on System z ATS
IBM, Endicott, NY < <http://www.vm.ibm.com/service/vmreqze.html>
http://www.vm.ibm.com/service/vmreqze.html> 
<http://www.vm.ibm.com/service/vmreqze.html> 


_____________________________________________________
This message contains information which is privileged and confidential and is 
solely for the use of the
intended recipient. If you are not the intended recipient, be aware that any 
review, disclosure,
copying, distribution, or use of the contents of this message is strictly 
prohibited. If you have
received this in error, please destroy it immediately and notify us at 
privacy...@ailife.com.

Reply via email to