|
Dear Sir,
According to the instruction of Minister Janab Dr.Atta ur
Rehman to stop the "socially unacceptable material flowing in
through the net."
We nominate the following members for the
committee.
QoS,
The proposal on QoS, which was
discussed with Mr.Ansari Sahib will be sent you soon by Mr.Jamal Nasir
Khan Chairman Technical Committee of ISPAK.
By the way which net you are using ?
Best wishes.
Sanaullah Bhutta,
President ISPAK.
----- Original Message --
Sent: Monday, July 09, 2001 5:13 PM
Subject: QOS
Dear Mr. Bhutta,
You mentioned that QoS proposal has been sent to
Mr. Ansari. Since he is out of the country could you send me a copy of
the proposal (in electronic form if possible). I am thoroughly fed up
with the performance of my internet connection and have received complaints
from various quarters of the country. I hope this proposal addresses
that issue.
I am also copying this mail to "ispak Mailing
list". The Hon. Minister has directed that a Nationwide committee be
setup to look into the various complaints received reg. socially unacceptable
material flowing in through the net. The committee has to report within
7 days. I believe our job will be to focus on the technical feasibility
of the solution. I need one person from ISPAK to be on this
committee. We will operate virtually so the location is not important as
long as the person has a good email connection.
would like to have the person identified before
the end of the day today. The person needs to know the business aspect
as well the technical intricacies.
Regards,
Tariq Badsha Member (IT), IT and Telecom Division Ministry of
Science and Technology Government of Pakistan
----- Original Message -----
Sent: Saturday, September 08, 2001 6:26
AM
Subject: Re: SEAMEW- 3 - DEMAND NOTE
ISSANCE PROBLEMS - WEB NET COMMUNICATION SERVICES
Janab Dr.Sahib,
AoA,
All our matters with PTCL are moving very much positive.
The delay to demand note to applicants was due to our proposal that there
should be a back-up with the applicant so we are making a policy on it.
Second, the condition of QoS was also under consideration with
Mr.Salman Ansari sahib . ISPAK had a useful meeting with Mr.Ansari and ISPAK
We proposed a alternative proposal for QoS to Mr.Salman Ansari and are
waiting his feed-back.
PTCL was going to issues demand note but I requested
not to issue till we solve the issue of back-up and QoS.
Back-up issue is very much important. If a
user have this single source and there is breach of cable , the
restoration will takes minimum 15 days, then he will start to
cry. I desire to avoid this situation
Connectivity on
STM-1 should only be given to those who have already back-up or
PTCL arranges itself as it being done through TIER-1 , .the second
issue of QoS is most important and it should also be decided mutually MOST
and ISPAK. other wise there will arise many disputes
I apology for inconvenience to you on direct
approaching to you from our member on this issue..
Wish all the best.
Sanaullah Bhutta.
president ISPAK.
Dear Mr. Faisal Naseer,
Thank you for your e-mail dated 05 July 2001. As you are
aware it is only about two weeks that the submarine cable became
operative. You said that your application has been pending for two
months but this is irrelevant, since the facilities were not previously
available.
I am now writing to PTCL to provide you the necessary internet
connectivity expeditiously. I hope that will soon be done.
With kind regards,
-- Prof. Atta-ur-Rahman Minister for Science & Technology
D-Block Pak Secretariat Islamabad 44000 Pakistan
Tel: 92 51 920 2502, 9208026 Fax: 92 51 920 5233
Faisal Naseer wrote:
Dear Bhutta Sb, Thank you for your email, as i recall i did
send you a fax of the unsigned demand note and talked to you on the
phone about this. We received the demand note today but were informed by
competent PTCL employees that the link has been down for a week now
and it is non-restorable , i.e if the link goes down we will not
have the option of a backup link. If this is the case then i dont think
it will be feasible for any ISP to switch over on the STM-1 without
backup. I hope this missing backup link problem can be organised soon as
it will be beneficial to both PTCL and
ISP/DNOP's. regards,Faisal
Naseer
----- Original Message -----
Sent: Thursday, July 05, 2001
6:28 PM
Subject: Re: SEAMEW- 3 - DEMAND
NOTE ISSANCE PROBLEMS - WEB NET COMMUNICATION
SERVICES It would be better if you consult
us prior to write to Minister direct.Best
regards.Bhutta
----- Original Message -----
Sent: Thursday, July 05, 2001
3:09 PM
Subject: SEAMEW- 3 - DEMAND
NOTE ISSANCE PROBLEMS - WEB NET COMMUNICATION SERVICES
**** URGENT
**** Dear Pro. Atta-ur-Rahman, With Reference to our application for
upgrade to 2MBPS on the SEAMEW-3 Fibre Optic Cable on the New Rates
Announced by your goodself and PTCL in the Dawn Newspaper we are
once again put into a very difficult position. Our application for
the above circuit has been pending for the last 2 months now,
despite contacting all concerned departments in Karachi we still
have not received our demand note. Although the demand note is with
DE VAS it has not been signed. Despite our repeated requests to
expedite the matter we have been put on the verge of shutting
down our operations. We have already submitted our termination
letter to our half international circuit provider Teleglobe which
will expire on the 31st of July 2001. If PTCL does not issue us the demand
note and provide us with the 2MBPS link before the end of this month
in effect our services will be shut down. It is my request
and hope that you will help us in this situation and issue necessary
intructions to the concerned PTCL deparments to expidite our 2MBPS
link. Anticipating
your always prompt action.Yours Faithfully, Faisal NaseerChief ExecutiveWeb Net Communication Services Pvt Ltd.Mobile :-
0300-8254-750
|