Robert Vesse wrote: > I would release now as we have several more rounds of emails and votes to get > through before Jena actually gets to graduate, namely: > > - Proposed Resolution Discussion on [email protected] > - Resolution vote on [email protected] > - Board Meeting (which is third monday of month so if we time everything > nicely we may get graduation approved by end of April)
Hi Rob We currently have two +1 from committers, vote has closed. I think it is possible to run the [VOTE] for longer an wait to see if another vote comes (if it is necessary) before sending the [VOTE] on [email protected]. But, I am not sure about this. I assumed my [VOTE] was implicit, but I guess it is a wrong assumption, so I explicitly voted now (but after the deadline). Is such vote valid? Will the [VOTE] for LARQ be the last [VOTE] for a release of a module before sending the [VOTE] for graduation or we need/want to release SDB as well before that? Paolo > > Rob > > Rob Vesse -- YarcData.com<http://YarcData.com> -- A Division of Cray Inc > Software Engineer, Bay Area > m: 925.960.3941 | o: 925.264.4729 | @: > [email protected]<mailto:[email protected]> | Skype: rvesse > 6210 Stoneridge Mall Rd | Suite 120 | Pleasanton CA, 94588 > > [cid:[email protected]] > > On Mar 27, 2012, at 4:28 AM, Paolo Castagna wrote: > > Paolo Castagna wrote: > Hi, what should we do about this? > > Just to clarify. > > I replied to Andy's comments in this thread and with changes in SVN, but I > did not ignored his +1 vote. Therefore, I didn't think it was necessary to > cut another RC since there aren't major issues. > > In the meantime, the [VOTE] for graduating Jena came. > > I see two options: > > 1. release LARQ before graduating > 2. release LARQ after graduation > > If you want to suggest a third option, I am open and happy to help. > My third option at the moment would not be constructive, so omitted. :-) > > Paolo > > > Paolo > > Paolo Castagna wrote: > Hi, > here is the vote on a release build for Jena LARQ 1.0.0 > > Staging repository: > https://repository.apache.org/content/repositories/orgapachejena-100/ > > Proposed files and structure to merge with existing dist/ area: > http://people.apache.org/~castagna/merge-jena-larq-1.0.0-RC-1/ > > Keys: > http://www.apache.org/dist/incubator/jena/KEYS > > SVN tag: > https://svn.apache.org/repos/asf/incubator/jena/Jena2/LARQ/tags/jena-larq-1.0.0-incubating-RC-1/ > > The module is tagged with the version and "RC-1" to denote the first release > candidate for this release cycle. If voted on successfully, the tag will be > changed ("svn mv") to the same name but minus > the RC-1. > > > Please vote to approve this release: > > [ ] +1 Approve the release > [ ] 0 Don't care > [ ] -1 Don't release, because ... > > This vote will be open to the end of > > Sunday 26/March 23:59 UTC > (72 hours from the same hour tonight). > > Paolo > > >
