Robert Vesse wrote:
> I would release now as we have several more rounds of emails and votes to get 
> through before Jena actually gets to graduate, namely:
> 
> - Proposed Resolution Discussion on [email protected]
> - Resolution vote on [email protected]
> - Board Meeting (which is third monday of month so if we time everything 
> nicely we may get graduation approved by end of April)

Hi Rob

We currently have two +1 from committers, vote has closed.
I think it is possible to run the [VOTE] for longer an wait to
see if another vote comes (if it is necessary) before sending
the [VOTE] on [email protected]. But, I am not sure about this.

I assumed my [VOTE] was implicit, but I guess it is a wrong
assumption, so I explicitly voted now (but after the deadline).
Is such vote valid?

Will the [VOTE] for LARQ be the last [VOTE] for a release of a
module before sending the [VOTE] for graduation or we need/want
to release SDB as well before that?

Paolo

> 
> Rob
> 
> Rob Vesse -- YarcData.com<http://YarcData.com> -- A Division of Cray Inc
> Software Engineer, Bay Area
> m: 925.960.3941  |  o: 925.264.4729 | @: 
> [email protected]<mailto:[email protected]>  |  Skype: rvesse
> 6210 Stoneridge Mall Rd  |  Suite 120  | Pleasanton CA, 94588
> 
> [cid:[email protected]]
> 
> On Mar 27, 2012, at 4:28 AM, Paolo Castagna wrote:
> 
> Paolo Castagna wrote:
> Hi, what should we do about this?
> 
> Just to clarify.
> 
> I replied to Andy's comments in this thread and with changes in SVN, but I
> did not ignored his +1 vote. Therefore, I didn't think it was necessary to
> cut another RC since there aren't major issues.
> 
> In the meantime, the [VOTE] for graduating Jena came.
> 
> I see two options:
> 
> 1. release LARQ before graduating
> 2. release LARQ after graduation
> 
> If you want to suggest a third option, I am open and happy to help.
> My third option at the moment would not be constructive, so omitted. :-)
> 
> Paolo
> 
> 
> Paolo
> 
> Paolo Castagna wrote:
> Hi,
> here is the vote on a release build for Jena LARQ 1.0.0
> 
> Staging repository:
> https://repository.apache.org/content/repositories/orgapachejena-100/
> 
> Proposed files and structure to merge with existing dist/ area:
> http://people.apache.org/~castagna/merge-jena-larq-1.0.0-RC-1/
> 
> Keys:
> http://www.apache.org/dist/incubator/jena/KEYS
> 
> SVN tag:
> https://svn.apache.org/repos/asf/incubator/jena/Jena2/LARQ/tags/jena-larq-1.0.0-incubating-RC-1/
> 
> The module is tagged with the version and "RC-1" to denote the first release 
> candidate for this release cycle.  If voted on successfully, the tag will be 
> changed ("svn mv") to the same name but minus
> the RC-1.
> 
> 
> Please vote to approve this release:
> 
>  [ ] +1 Approve the release
>  [ ]  0 Don't care
>  [ ] -1 Don't release, because ...
> 
> This vote will be open to the end of
> 
>  Sunday 26/March 23:59 UTC
>  (72 hours from the same hour tonight).
> 
> Paolo
> 
> 
> 

Reply via email to