Le 12/04/16 18:20, Scott Kostyshak a écrit :
On Tue, Apr 12, 2016 at 11:57:40AM -0400, Richard Heck wrote:
On 04/12/2016 04:42 AM, Jean-Marc Lasgouttes wrote:
Le 12/04/2016 04:09, Richard Heck a écrit :
I propose to create a 2.3.staging branch so development can proceed. We
did this with this 2.1 cycle. Alternatively, we could create a
2.2.0.fixes branch, from which 2.2.0 will be tagged, and you can have
full control over that.

Why don't we branch 2.2.x right now and resume working on master? Do
you think that the amount of work until 2.2.0 is so large that this
would entail work duplication?

I thought about that, too, but was reluctant to suggest it for fear of
starting a flame war. But it would be a natural thing to do at this point.

Scott, do you have views about this?

Would we then merge 2.2.x into master at the 2.2.0 release?

No we would manage that like we manage stable right now, by backporting one by one. It is like considering that rc1 is 2.2.-1 and that we already work with the stable branch, instead of beginning at 2.2.0 time.

It is your call, anyway.

JMarc

Reply via email to