On Fri, 17 Sep 2004, Herb Chong wrote:

> only $10 at the assembly line means only $100 at the sales counter.

This could mean either of two things:

- The MZ-50 would have been $100 cheaper than the MZ-10 (that the
  closest in spec with a lever I think)

- The lever and associated gear is not $10, but more like 10p.

I wish I had the time to investigate, just for the sake of it.

Kostas (upgraded to a -5n for the lever, but had no button workaround
option)

Reply via email to