As a small enhancement, we might consider erasing the linked image
output in modules/client/progress.py (as we do with other
progress/planning messages).
Actually, after peeking at the code, most of the _li_* functions do use
cprint with erase=True, so it looks like the intention was to erase this
output... Does that make this a bug?
Dave
On 10/24/2012 10:25 AM, Shawn Walker wrote:
They're not internal developer messages. They're progress messages
indicating that pkg(5) is working on a linked image (in this case,
non-global zones, which are linked to the parent).
And yes, the -C option will allow you to specify the number of linked
images pkg(5) will work on in parallel. Alternatively, you can set
PKG_CONCURRENCY in the environment. See pkg(1) for details.
-Shawn
On 10/24/12 04:15, Enda o'Connor - Oracle Ireland - Software Engineer
wrote:
Hi
just to be clear,
I am happy with the s11.1 verbose messages in general, they do at least
give me an indication of progress etc ie
http://timsfoster.wordpress.com/ "progress-tracking"
but I do feel that lots of messages like
Planning linked: 0/5 done; 1 working: zone:5240b
are not useful to most end users,
ie Planning linked, is I assume something to do with linked images, but
it conveys little meaning to me.
0/5 done, ok that is progress indicator of some sort I guess.
1 working , so one working what exactly, is there scope in pkg args to
make 2 of them work?
ie -C for parallel zones operations maybe?
Enda
On 10/24/12 11:37, Enda o'Connor - Oracle Ireland - Software Engineer
wrote:
Hi
On s11.1 FCS system with 5 zones, I ran
root@pst5240b:/# pkg uninstall "pkg://solaris/system/manual"
Packages to remove: 1
Create boot environment: No
Create backup boot environment: No
Planning linked: 0/5 done; 1 working: zone:5240b
Planning linked: 1/5 done; 1 working: zone:5240c
Planning linked: 2/5 done; 1 working: zone:5240a
Planning linked: 3/5 done; 1 working: zone:5240d
Planning linked: 4/5 done; 1 working: zone:5240e
Planning linked: 5/5 done
Downloading linked: 0/5 done; 1 working: zone:5240b
Downloading linked: 1/5 done; 1 working: zone:5240c
Downloading linked: 2/5 done; 1 working: zone:5240a
Downloading linked: 3/5 done; 1 working: zone:5240d
Downloading linked: 4/5 done; 1 working: zone:5240e
Downloading linked: 5/5 done
what are the above messages telling me, should they be suppressed and
replaced with some indicator that we are just doing stuff ie
......
They appear to be some internal developer messages.
Enda
_______________________________________________
pkg-discuss mailing list
[email protected]
http://mail.opensolaris.org/mailman/listinfo/pkg-discuss
--
Dave Vadovszki
(303)272-2686
500 Eldorado Blvd., Bldg.5
Broomfield, CO US 80021
_______________________________________________
pkg-discuss mailing list
[email protected]
http://mail.opensolaris.org/mailman/listinfo/pkg-discuss