1.       Does your facility have any guiding documents/training on the use of 1 
door & 2 door Small Article Monitors (SAM)?

2.       Specifically when the RCA exit points that  have a two door SAM and HP 
support is not in the immediate area or on the uncontrolled side of the SAM.  
When a worker is alone exiting the RCA and has more personnel materials 
(gloves, procedure, pens, clipboard) that can be placed into the SAM for a 
single counting sequence.  What is your expectation of the worker for 
monitoring/removing this personal materials?



3.       (Follow up question for #2) Would it acceptable for the individual to 
remove the cleared material from the SAM and then reach across the boundary to 
place it on the uncontrolled side of the boundary?



4.        The same question applies to areas where there is a single door SAM. 
Dou you require any compensatory actions for the individual and/or RP Tech to 
monitor the hand they use to move the "cleared' material across the RCA 
boundary to the Non-RCA side?



Thank you in advance  for your help.

Michael C. Wynn
Supervisor Radiological Analysis
Millstone Power Station
Bldg. 437/2
Rope Ferry Road
Waterford, CT 06370
Office: (860) 447-1791 Ext. 4815
Fax: (860) 444-4241
http://www.dom.com/



CONFIDENTIALITY NOTICE:  This electronic message contains
information which may be legally confidential and/or privileged and
does not in any case represent a firm ENERGY COMMODITY bid or offer
relating thereto which binds the sender without an additional
express written confirmation to that effect.  The information is
intended solely for the individual or entity named above and access
by anyone else is unauthorized.  If you are not the intended
recipient, any disclosure, copying, distribution, or use of the
contents of this information is prohibited and may be unlawful.  If
you have received this electronic transmission in error, please
reply immediately to the sender that you have received the message
in error, and delete it.  Thank you.

Reply via email to