Millstone is implementing during our refueling outage the requirement to wear (disposable Orex) PC hoods to meet our RWP full PC dress requirements for contaminated area work. I'd like to pulse the industry on the following:
1) How does your station incorporate the use of PC hoods? (e.g., RWP requirement, optional, etc..) 2) What has been the overall benefit of using PC hoods? (e.g., reduced PCE's, etc..) 3) What insights or challenges has your station experienced from the use of PC hoods? Thank you all in advance. Michael C. Wynn Supervisor Radiological Analysis Millstone Power Station Bldg. 437/2 Rope Ferry Road Waterford, CT 06370 Office: (860) 447-1791 Ext. 4815 Fax: (860) 444-4241 http://www.dom.com/ CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.
