We have a interpretation problem among some people I work with with, and 690.12 Rapid Shut Down and the the 10 second time for reducing ac and dc conductors to 240ma, and 30V. The word "initiation" seems to indicate that all affected conductors need to be at these levels within 10 seconds of de-energizing either the ac or dc conductors. If so, then the disconnects need to be co-located to meet this requirement if this interpretation is correct.

I have read Mr. Brook's article in Solar Pro, but AHJs may feel differently.

Would anyone care to weigh in on their interpretation?

Thank you, Chris





--
Christopher Warfel, President
ENTECH Engineering, Inc.
PO Box 871, Block Island, RI 02807
401-466-8978

<<attachment: cwarfel.vcf>>

_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to