Reasonable inspector, here? You have no idea.

The plans examiner is the first link in the process here in Idaho, he is; by 
the book, crossing t’s & dotting I’s and has a very strict & narrow 
interpretation of the code. That said he is very helpful and a nice guy. It’s 
an Idaho thing. 

 

----------------------------------------------------------------------------

Dana Orzel                              Great Solar Works, Inc. 

C - 208.721.7003                       d...@solarwork.com

Idaho Contractor - # 028765         Idaho PV # 028374

NABCEP # 051112-136                        <http://www.solarwork.biz> 
www.solarwork.biz

"Responsible Technologies for Responsible People since 1988"  

P Please consider the environment before printing this email.

 

 

From: RE-wrenches <re-wrenches-boun...@lists.re-wrenches.org> On Behalf Of 
cwarfel
Sent: Friday, April 20, 2018 9:23 AM
To: re-wrenches@lists.re-wrenches.org
Subject: Re: [RE-wrenches] Looking for insulated #6 bare standoff

 

I just got back from being out of the office for a week+ and just read a few of 
these. I hope this is not redundant.

6AWG is the size that meets several tests for exposed installations. By that I 
mean that it is not protected.  If you are running the array EGC exposed, you 
would use at least 6AWG depending upon the size of the overcurrent protection 
device towards the charge controller/array disconnect. 250.120(C) and T250.122.

We have run into the conductor covering rating problem too. #4 can be color 
coded so you can use black conductor. A reasonable inspector should allow this 
for 6 since a lot of the non black coverings are not holding up as well to 
sunlight as black.  I think NEC2017 takes this into consideration and allows 
you to color code because of the superior performance of black coverings. 

Chris

 

On 4/20/2018 9:00 AM, Dana wrote:

That makes two of us that would like to understand, why #6? I think it dates to 
early grounding with grid tie systems.
I remember back to 20+ years ago when the code required that the EGC was the 
size of the largest conductor which with 24 volt inverters was OOOO.
 
----------------------------------------------------------------------------
Dana Orzel                              Great Solar Works, Inc. 
C - 208.721.7003                       d...@solarwork.com 
<mailto:d...@solarwork.com> 
Idaho Contractor - # 028765         Idaho PV # 028374
NABCEP # 051112-136                       www.solarwork.biz 
<http://www.solarwork.biz> 
"Responsible Technologies for Responsible People since 1988"  
P Please consider the environment before printing this email.
 
 
-----Original Message-----
From: RE-wrenches  <mailto:re-wrenches-boun...@lists.re-wrenches.org> 
<re-wrenches-boun...@lists.re-wrenches.org> On Behalf Of Dave Angelini Offgrid 
Solar
Sent: Thursday, April 19, 2018 3:57 PM
To: RE-wrenches  <mailto:re-wrenches@lists.re-wrenches.org> 
<re-wrenches@lists.re-wrenches.org>
Subject: Re: [RE-wrenches] Looking for insulated #6 bare standoff
 
 Dana, I understand the need to use #6 in exposed places on the earth. I have 
had inspectors require the same wire size that is used to the battery. I have 
had them require the same size as the array wiring. I have never seen them do 
what they are doing to you so thanks for the info....  Be well!  --Dave

The bare #8 is an EGC for #10 USE PV wire on the tracker to the array 
mounted combiner box.
 
----------------------------------------------------------------------------
Dana Orzel                              Great Solar Works, Inc.
C - 208.721.7003                       d...@solarwork.com 
<mailto:d...@solarwork.com> 
Idaho Contractor - # 028765         Idaho PV # 028374
NABCEP # 051112-136                       www.solarwork.biz 
<http://www.solarwork.biz> 
"Responsible Technologies for Responsible People since 1988"
 Please consider the environment before printing this email.
 
 
-----Original Message-----
From: RE-wrenches  <mailto:re-wrenches-boun...@lists.re-wrenches.org> 
<re-wrenches-boun...@lists.re-wrenches.org> On 
Behalf Of Hilton Dier
Sent: Thursday, April 19, 2018 3:39 PM
To: re-wrenches@lists.re-wrenches.org 
<mailto:re-wrenches@lists.re-wrenches.org> 
Subject: [RE-wrenches] Looking for insulated #6 bare standoff
 
Would #8 meet code? I thought that exposed ground wire had to be #6 
minimum.
 
Hilton Dier III
Renewable Energy Design
Missisquoi River Hydro LLC
_______________________________________________
List sponsored by Redwood Alliance
 
List Address: RE-wrenches@lists.re-wrenches.org 
<mailto:RE-wrenches@lists.re-wrenches.org> 
 
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
 
List-Archive:
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist
.html
 
List rules & etiquette:
www.re-wrenches.org/etiquette.htm <http://www.re-wrenches.org/etiquette.htm> 
 
Check out or update participant bios:
www.members.re-wrenches.org <http://www.members.re-wrenches.org> 
 
_______________________________________________
List sponsored by Redwood Alliance
 
List Address: RE-wrenches@lists.re-wrenches.org 
<mailto:RE-wrenches@lists.re-wrenches.org> 
 
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
 
List-Archive:
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist
.html
 
List rules & etiquette:
www.re-wrenches.org/etiquette.htm <http://www.re-wrenches.org/etiquette.htm> 
 
Check out or update participant bios:
www.members.re-wrenches.org <http://www.members.re-wrenches.org> 
 
 

 
 
Dave Angelini Offgrid Solar
"we go where powerlines don't"
http://members.sti.net/offgridsolar/
e-mail  offgridso...@sti.net <mailto:offgridso...@sti.net> 
text 209 813 0060
 
_______________________________________________
List sponsored by Redwood Alliance
 
List Address: RE-wrenches@lists.re-wrenches.org 
<mailto:RE-wrenches@lists.re-wrenches.org> 
 
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
 
List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
 
List rules & etiquette:
www.re-wrenches.org/etiquette.htm <http://www.re-wrenches.org/etiquette.htm> 
 
Check out or update participant bios:
www.members.re-wrenches.org <http://www.members.re-wrenches.org> 
 
_______________________________________________
List sponsored by Redwood Alliance
 
List Address: RE-wrenches@lists.re-wrenches.org 
<mailto:RE-wrenches@lists.re-wrenches.org> 
 
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
 
List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
 
List rules & etiquette:
www.re-wrenches.org/etiquette.htm <http://www.re-wrenches.org/etiquette.htm> 
 
Check out or update participant bios:
www.members.re-wrenches.org <http://www.members.re-wrenches.org> 
 

 

-- 

 

         Christopher Warfel, PE
       ENTECH Engineering, Inc.
PO Box 871, Block Island, RI 02807
               (401)466-8978

 
 <http://entech-engineering.com> 

_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to