I can't say every fire department does this but should, depending on wind
speed and direction will drive which side of a ridge is to be vented.
Jerry

On Thu, Jul 12, 2018, 11:01 AM <drake.chamber...@redwoodalliance.org> wrote:

> It is an interesting issue. If you have a peak roof with modules on the
> south side only, venting through the north side is wide open. Possibly the
> NEC could acknowledge this fact.
>
>
>
> ----- Original Message -----
> From:
> "RE-wrenches" <re-wrenches@lists.re-wrenches.org>
>
> To:
> "RE-wrenches" <re-wrenches@lists.re-wrenches.org>
> Cc:
>
> Sent:
> Thu, 12 Jul 2018 15:07:18 -0500
> Subject:
> Re: [RE-wrenches] Solar set backs
>
>
> I had a student tell me that firefighters are often venting through the
> gable side wall as opposed to the roof.  Can anyone confirm or deny this
> statement?
>
>
> Shine On!
>
> Kris Schmid
> Legacy Solar, LLC
> 137 West 1st Avenue
> Luck, WI 54853
> www.legacysolar.com
> 715-653-4295
> NABCEP Certified PV Installation Professional
> Licensed Wisconsin Master Electrician
> BSEE
>
> On Tue, Jul 10, 2018 at 6:46 PM, <cwar...@entech-engineering.com> wrote:
>
>> NYSERDA out of NY has reasonable amendments to the IBC for setbacks for
>> access and ventilation. They clarify that the hip roof valley is 18" either
>> side for a total of 36" width.
>>
>>
>>
>> On 2018-07-10 17:38, Wayne Irwin wrote:
>>
>> Calfire code seems to be the standard being somewhat enforced as the
>> standard nationwide.
>>
>> Wayne Irwin,
>> President
>> License #CVC56695
>> State Licensed Solar Contractor
>> Pure Energy Solar International Inc.
>> wa...@pureenergysolar.com
>> http://PureEnergySolar.com
>> http://SolarChargingStation.net
>> 352 377-6527 Office
>> 352 336-3299 Fax
>>
>>
>> The Sun Is Always Shining!
>>
>> The content of this message is Pure Energy Solar Confidential. If you are
>> not the intended recipient and have received this message in error, any use
>> or distribution is prohibited. Please notify me immediately by reply e-mail
>> and delete this message from your computer system. Thank you.
>> ------------------------------
>> *From:* RE-wrenches <re-wrenches-boun...@lists.re-wrenches.org> on
>> behalf of Daniel Young <dyo...@dovetailsolar.com>
>> *Sent:* Tuesday, July 10, 2018 5:25:01 PM
>> *To:* 'RE-wrenches'
>> *Subject:* Re: [RE-wrenches] Solar set backs
>>
>>
>> Hey Gary,
>>
>>
>>
>> Ohio Fire Code does cover this. It's a matter of if the Fire marshal in
>> you project area wants to waive or alter the requirements.
>>
>>
>>
>> http://codes.ohio.gov/oac/1301:7-7-06v1
>>
>>
>>
>> Specifically 605.11.1.2 is for residential buildings. There is some
>> conflict in terms of Hip roofs in the code there. 605.11.1.2.2 states a
>> single 3ft path on one edge or another for a hip roof, but 605.11.1.2.4
>> states that an 18 space is allowed when modules are mounted on two adjacent
>> roof planes with a hip roof.
>>
>>
>>
>> With Regards,
>>
>>
>>
>> Daniel Young,
>>
>> NABCEP Certified PV Installation ProfessionalTM: Cert #031508-90
>>
>>
>>
>> *From:* RE-wrenches <re-wrenches-boun...@lists.re-wrenches.org> *On
>> Behalf Of *gary easton
>> *Sent:* Monday, July 09, 2018 3:39 PM
>> *To:* RE-wrenches <re-wrenches@lists.re-wrenches.org>
>> *Subject:* [RE-wrenches] Solar set backs
>>
>>
>>
>> Hello Wrenches,
>>
>> What are you all seeing required as setbacks post 2017?  I am having
>> inspectors vary between wanting a 3' lane at the bottom and sides to
>> allowing the array down to the gutter, and from requiring between 18" and
>> 3' at the ridge.
>>
>>
>>
>> --
>>
>> Gary Easton
>> Appalachian Renewable Power
>>
>> Stewart, Ohio 45778
>> NABCEP Certified Solar PV
>>
>> T: 740-277-8498
>>
>>  www.arp-solar.com
>>
>>
>> "First they ignore you. Then they laugh at you. Then they fight you. Then
>> you win."
>>
>> ~Ghandi
>>
>>
>>
>> _______________________________________________
>> List sponsored by Redwood Alliance
>>
>> List Address: RE-wrenches@lists.re-wrenches.org
>>
>> Change listserver email address & settings:
>> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>>
>> List-Archive:
>> http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
>>
>> List rules & etiquette:
>> www.re-wrenches.org/etiquette.htm
>>
>> Check out or update participant bios:
>> www.members.re-wrenches.org
>>
>>
>> _______________________________________________
>> List sponsored by Redwood Alliance
>>
>> List Address: RE-wrenches@lists.re-wrenches.org
>>
>> Change listserver email address & settings:
>> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>>
>> List-Archive:
>> http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
>>
>> List rules & etiquette:
>> www.re-wrenches.org/etiquette.htm
>>
>> Check out or update participant bios:
>> www.members.re-wrenches.org
>>
>>
>>
> _______________________________________________
> List sponsored by Redwood Alliance
>
> List Address: RE-wrenches@lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive:
> http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> www.members.re-wrenches.org
>
>
_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to