Based on your time crunch, I see 2 options: 1) Use 1/2 piece HO and 1/2 piece cork together. Staple in place if you want to move it later. Ideally paint roadbed gray, assuming you don't want to make it permanent by ballasting. Then drill a hole about every foot in a tie and use the brads to hold the track. Cork roadbed is available at any reasonably well stocked train store. If you can only get HO roadbed then you need to cut an additional strip that fills in the center.
2) Don't use roadbed at all and go with your dark headed brad idea. Again, place one about every food or, if you're using sectional track, one at one side of every joint. Drill the tiny hole the brad needs to avoid damaging the track. "waldootten " wrote: > > As I posted a few days ago, I've had a very bad experience with the > service at InternetTrains.com -- my order of a month ago for 450 > feet of AMI Instant Roadbed was put on back order -- even though I > made it plain to the sales rep I spoke with that I needed it right > away. She thought the stuff was in stock, it wasn't -- but they > never cared enough to notify me. Heck, knowing that, I could have > spent the last four weeks looking elsewhere for the same product. > Like a dope, I believed in them and waited and now I have a huge > problem. I'm told AMI is out of five of the sizes/colors and is in > the middle of a production run. I'm told no retailer has in stock > any of the 2-inch black I need at this time. > > I have about 40 children due this Saturday late afternoon to see > original American Flyer. I plan to lay about 275 feet of track on > five main lines and run eight trains at once. I am using American > Models track. Obviously, now I have to really work fast and am > forced to change my original plan. I want to get some track down > quick on a plywood base covered (temporarily) with grass rolls. But > I don't want to to be too "permanent" so when I can get the AMI > roadbed I can pull the track up easily and do the job the way I > planned. > > Any advice on the best way to anchor the AM track to the plywood > over the ersatz "grass" rolls? I don't want to damage the track in > any way when I pick it up later on. I was thinking small, dark- > headed brad nails. But I'm sure someone else has a better idea. > > Thanks in advance, > > Phil K > > S-Trains list sponsor: http://www.americanflyertrains.com > All the Flyer you desire...books and accessories too! > > To UNSUBSCRIBE from this list send a note to [EMAIL PROTECTED] > > Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/ -- Chuck Smith of the NASG, Rochester Area S Gaugers (RASG) and the S Gauge Chemung Valley Lines. http://home.eznet.net/~cesmith "It is often wiser to remain silent and be thought a fool than to speak up and remove all doubt." Mark Twain S-Trains list sponsor: http://www.americanflyertrains.com All the Flyer you desire...books and accessories too! To UNSUBSCRIBE from this list send a note to [EMAIL PROTECTED] Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/
