around here, that's US Forest Service or Bureau of Land Management - 
they have jurisdiction over much of the mountain land here.




Blair Davis wrote:


FS/BLM??


A. Huppenthal wrote:

Any comments on freestanding towers? Apparently the FS/BLM want all 
new towers to be free standing in many areas.


Brian Rohrbacher wrote:

I won't skip, but I don't want to waste.  I want to do it exactly 
what is needs to be, well, if it's suppose to be a 48 inch hole, I'd 
do 49.  But I don't want to have to do 5 ft.  I want to figure 
enough for the job without wasting material and time.  Believe me, I 
want efficiency, not corner cutting.


JohnnyO wrote:

CPE - PLUS a climber while it's being installed - Don't skimp Brian 
- I prob do more things out of specs then most - but that is b/c I 
add overkill into our tower bases
 
JohnnyO


-Original Message-
*From:* [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] *On Behalf Of *Brian 
Rohrbacher

*Sent:* Monday, August 22, 2005 9:47 AM
*To:* WISPA General List
*Subject:* Re: [WISPA] Rohn BX Tower

I know.  On one hand I want it good enough for a CPE, but on the
other hand I don't want to hear on the news 20 years from now
that it crashed over and killed a guy when he wanted to put his
VW Bug on top of it.  I want to build it to take whatever people
want to put on it.

Scott Reed wrote:


Only a CPE today, but towers always beg for more equipment.
Don't skimp, you never know what you will want/need in the 
future.


Scott Reed
Owner
NewWays
Wireless Networking
Network Design, Installation and Administration
www.nwwnet.net <http://www.nwwnet.net/>

*-- Original Message ---*
From: Brian Rohrbacher <[EMAIL PROTECTED]>
To: WISPA General List 
    Sent: Mon, 22 Aug 2005 08:34:03 -0400
Subject: Re: [WISPA] Rohn BX Tower

> Portland cement has no gravel.  I'll mix it 4 parts to one. 
So.those 15 94 lb bags are like 60 94 lb bags.  I had

figured I needed 1.28 yards for the hole I dug.  But now that I
have the specs I will see how big the hole has to be.  I will
only put a CPE on this tower.  Nothing huge.
>
> Brian
>
> Mark Koskenmaki wrote:


15 bags of cement won't mean squat in a hole that
big.









North East Oregon Fastnet, LLC
509-593-4061

personal correspondence to:  mark at neofast dot
net

sales inquiries to:  purchasing at neofast dot
net

Fast Internet, NO
WIRES!

 



-

- Original Message -


From: "Brian Rohrbacher" <[EMAIL PROTECTED]>
To: 
Sent: Sunday, August 21, 2005 7:21 PM
Subject: [WISPA] Rohn BX Tower

 
 


I dug a hole 32 inch square by 42 inches deep yesterday for a
rohn
bx

tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland
cement

  



and will add my own
gravel.

 

 


I was thinking about three 1 1/2 inch pieces of pipe stuck in
the
concrete

  



to bolt the tower legs to.  I
will

 

 


thread and put couplers on the pipe at 22 inches so they can't
move. I've

  



got some re-bar to chuck down in the hole
too.

 

 


I've got 3 8ft ground rods and will bond with #4 bare stranded
wire. I

  



picked up a load of grade 8
bolts,

 

 


washers, and lock washers for bolting the tower together and to
the
pipe

  



stubs.  Anyone have any
suggestions

 

 


for me?  This is my first tower.  I will pour tomorrow
afternoon.



brian





--



WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/
   



 

  




*--- End of Original Message ---*

 



No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 
8/19/2005
 

 



No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 
8/19/2005
 








--
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-22 Thread Blair Davis

FS/BLM??


A. Huppenthal wrote:

Any comments on freestanding towers? Apparently the FS/BLM want all 
new towers to be free standing in many areas.


Brian Rohrbacher wrote:

I won't skip, but I don't want to waste.  I want to do it exactly 
what is needs to be, well, if it's suppose to be a 48 inch hole, I'd 
do 49.  But I don't want to have to do 5 ft.  I want to figure enough 
for the job without wasting material and time.  Believe me, I want 
efficiency, not corner cutting.


JohnnyO wrote:

CPE - PLUS a climber while it's being installed - Don't skimp Brian 
- I prob do more things out of specs then most - but that is b/c I 
add overkill into our tower bases
 
JohnnyO


-Original Message-
*From:* [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] *On Behalf Of *Brian Rohrbacher
*Sent:* Monday, August 22, 2005 9:47 AM
*To:* WISPA General List
*Subject:* Re: [WISPA] Rohn BX Tower

I know.  On one hand I want it good enough for a CPE, but on the
other hand I don't want to hear on the news 20 years from now
that it crashed over and killed a guy when he wanted to put his
VW Bug on top of it.  I want to build it to take whatever people
want to put on it.

Scott Reed wrote:


Only a CPE today, but towers always beg for more equipment.
Don't skimp, you never know what you will want/need in the future.

Scott Reed
Owner
NewWays
Wireless Networking
Network Design, Installation and Administration
www.nwwnet.net <http://www.nwwnet.net/>

*-- Original Message ---*
From: Brian Rohrbacher <[EMAIL PROTECTED]>
To: WISPA General List 
    Sent: Mon, 22 Aug 2005 08:34:03 -0400
Subject: Re: [WISPA] Rohn BX Tower

> Portland cement has no gravel.  I'll mix it 4 parts to one. 
So.those 15 94 lb bags are like 60 94 lb bags.  I had

figured I needed 1.28 yards for the hole I dug.  But now that I
have the specs I will see how big the hole has to be.  I will
only put a CPE on this tower.  Nothing huge.
>
> Brian
>
> Mark Koskenmaki wrote:


15 bags of cement won't mean squat in a hole that
big.









North East Oregon Fastnet, LLC
509-593-4061

personal correspondence to:  mark at neofast dot
net

sales inquiries to:  purchasing at neofast dot
net

Fast Internet, NO
WIRES!

 



-

- Original Message -


From: "Brian Rohrbacher" <[EMAIL PROTECTED]>
To: 
Sent: Sunday, August 21, 2005 7:21 PM
Subject: [WISPA] Rohn BX Tower

 
  


I dug a hole 32 inch square by 42 inches deep yesterday for a
rohn
bx

tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland
cement

  



and will add my own
gravel.

 

  


I was thinking about three 1 1/2 inch pieces of pipe stuck in
the
concrete

  



to bolt the tower legs to.  I
will

 

  


thread and put couplers on the pipe at 22 inches so they can't
move. 
I've


  



got some re-bar to chuck down in the hole
too.

 

  


I've got 3 8ft ground rods and will bond with #4 bare stranded
wire. 
I


  



picked up a load of grade 8
bolts,

 

  


washers, and lock washers for bolting the tower together and to
the
pipe

  



stubs.  Anyone have any
suggestions

 

  


for me?  This is my first tower.  I will pour tomorrow
afternoon.



brian





--



WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/
   


 

  



*--- End of Original Message ---*

 



No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 
8/19/2005
 

 



No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 
8/19/2005
 






--
Blair Davis

AOL IM Screen Name --  Theory240

West Michigan Wireless ISP
269-686-8648

A division of:
Camp Communication Services, INC

--
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-22 Thread A. Huppenthal
Any comments on freestanding towers? Apparently the FS/BLM want all new 
towers to be free standing in many areas.


Brian Rohrbacher wrote:

I won't skip, but I don't want to waste.  I want to do it exactly what 
is needs to be, well, if it's suppose to be a 48 inch hole, I'd do 
49.  But I don't want to have to do 5 ft.  I want to figure enough for 
the job without wasting material and time.  Believe me, I want 
efficiency, not corner cutting.


JohnnyO wrote:

CPE - PLUS a climber while it's being installed - Don't skimp Brian - 
I prob do more things out of specs then most - but that is b/c I add 
overkill into our tower bases
 
JohnnyO


-Original Message-
*From:* [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] *On Behalf Of *Brian Rohrbacher
*Sent:* Monday, August 22, 2005 9:47 AM
*To:* WISPA General List
*Subject:* Re: [WISPA] Rohn BX Tower

I know.  On one hand I want it good enough for a CPE, but on the
other hand I don't want to hear on the news 20 years from now
that it crashed over and killed a guy when he wanted to put his
VW Bug on top of it.  I want to build it to take whatever people
want to put on it.

Scott Reed wrote:


Only a CPE today, but towers always beg for more equipment.
Don't skimp, you never know what you will want/need in the future.

Scott Reed
Owner
NewWays
Wireless Networking
Network Design, Installation and Administration
www.nwwnet.net <http://www.nwwnet.net/>

*-- Original Message ---*
From: Brian Rohrbacher <[EMAIL PROTECTED]>
To: WISPA General List 
    Sent: Mon, 22 Aug 2005 08:34:03 -0400
Subject: Re: [WISPA] Rohn BX Tower

> Portland cement has no gravel.  I'll mix it 4 parts to one. 
So.those 15 94 lb bags are like 60 94 lb bags.  I had

figured I needed 1.28 yards for the hole I dug.  But now that I
have the specs I will see how big the hole has to be.  I will
only put a CPE on this tower.  Nothing huge.
>
> Brian
>
> Mark Koskenmaki wrote:

15 bags of cement won't mean squat in a hole that 


big.









North East Oregon Fastnet, LLC 


509-593-4061

personal correspondence to:  mark at neofast dot 


net

sales inquiries to:  purchasing at neofast dot 


net

Fast Internet, NO 


WIRES!



-

- Original Message - 




From: "Brian Rohrbacher" <[EMAIL PROTECTED]>
To: 
Sent: Sunday, August 21, 2005 7:21 
PM
Subject: [WISPA] Rohn BX 
Tower


 
   

I dug a hole 32 inch square by 42 inches deep yesterday for a 

rohn 


bx

tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland 


cement

   

 

and will add my own 


gravel.

 

   

I was thinking about three 1 1/2 inch pieces of pipe stuck in 

the 


concrete

   

 

to bolt the tower legs to.  I 


will

 

   

thread and put couplers on the pipe at 22 inches so they can't 

move.  


I've

   

 

got some re-bar to chuck down in the hole 


too.

 

   

I've got 3 8ft ground rods and will bond with #4 bare stranded 

wire.  


I

   

 

picked up a load of grade 8 


bolts,

 

   

washers, and lock washers for bolting the tower together and to 

the 


pipe

   

 

stubs.  Anyone have any 


suggestions

 

   

for me?  This is my first tower.  I will pour tomorrow 


afternoon.



brian





--



WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/
   
 

 

   



*--- End of Original Message ---*



No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 8/19/2005
 




No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 8/19/2005
 



--
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-22 Thread Brian Rohrbacher
Title: Message




I won't skip, but I don't want to waste.  I want to do it exactly what
is needs to be, well, if it's suppose to be a 48 inch hole, I'd do 49. 
But I don't want to have to do 5 ft.  I want to figure enough for the
job without wasting material and time.  Believe me, I want efficiency,
not corner cutting.

JohnnyO wrote:

  
  
  
  CPE - PLUS a climber while it's being installed
- Don't skimp Brian - I prob do more things out of specs then most -
but that is b/c I add overkill into our tower bases
   
  JohnnyO
  
-Original Message-
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED]] On Behalf Of Brian
Rohrbacher
Sent: Monday, August 22, 2005 9:47 AM
To: WISPA General List
    Subject: Re: [WISPA] Rohn BX Tower


I know.  On one hand I want it good enough for a CPE, but on the other
hand I don't want to hear on the news 20 years from now that it crashed
over and killed a guy when he wanted to put his VW Bug on top of it.  I
want to build it to take whatever people want to put on it.

Scott Reed wrote:

  
  Only a CPE today, but towers always beg for more
equipment. Don't skimp, you never know what you will want/need in the
future. 
  
Scott Reed 
Owner 
NewWays 
Wireless Networking 
Network Design, Installation and Administration 
  www.nwwnet.net
  
  
  -- Original Message --- 
From: Brian Rohrbacher <[EMAIL PROTECTED]>
  
To: WISPA General List  
Sent: Mon, 22 Aug 2005 08:34:03 -0400 
Subject: Re: [WISPA] Rohn BX Tower 
  
> Portland cement has no gravel.  I'll mix it 4 parts to one. 
So.those 15 94 lb bags are like 60 94 lb bags.  I had figured I
needed 1.28 yards for the hole I dug.  But now that I have the specs I
will see how big the hole has to be.  I will only put a CPE on this
tower.  Nothing huge. 
> 
> Brian 
> 
> Mark Koskenmaki wrote:
  
15 bags of cement won't mean squat in a hole that 

big.









North East Oregon Fastnet, LLC 

509-593-4061

personal correspondence to:  mark at neofast dot 

net

sales inquiries to:  purchasing at neofast dot 

net

Fast Internet, NO 

WIRES!



-

- Original Message - 



From: "Brian Rohrbacher" <[EMAIL PROTECTED]>
To: 
Sent: Sunday, August 21, 2005 7:21 
PM
Subject: [WISPA] Rohn BX 
Tower

  


  I dug a hole 32 inch square by 42 inches deep yesterday for a 

rohn 

bx

tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland 

cement



  

and will add my own 

gravel.

  



  I was thinking about three 1 1/2 inch pieces of pipe stuck in 

the 

concrete



  

to bolt the tower legs to.  I 

will

  



  thread and put couplers on the pipe at 22 inches so they can't 

move.  

I've



  

got some re-bar to chuck down in the hole 

too.

  



  I've got 3 8ft ground rods and will bond with #4 bare stranded 

wire.  

I



  

picked up a load of grade 8 

bolts,

  



  washers, and lock washers for bolting the tower together and to 

the 

pipe



  

stubs.  Anyone have any 

suggestions

  



  for me?  This is my first tower.  I will pour tomorrow 

afternoon.



brian





-- 



WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

  

  


  
  
  --- End of Original Message --- 
  
  
No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 8/19/2005
  

  
  

No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 8/19/2005
  



-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


RE: [WISPA] Rohn BX Tower

2005-08-22 Thread JohnnyO
Title: Message



CPE - 
PLUS a climber while it's being installed - Don't skimp Brian - I prob do more 
things out of specs then most - but that is b/c I add overkill into our tower 
bases
 
JohnnyO

  
  -Original Message-From: 
  [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of 
  Brian RohrbacherSent: Monday, August 22, 2005 9:47 
  AMTo: WISPA General ListSubject: Re: [WISPA] Rohn BX 
  TowerI know.  On one hand I want it good enough for 
  a CPE, but on the other hand I don't want to hear on the news 20 years from 
  now that it crashed over and killed a guy when he wanted to put his VW Bug on 
  top of it.  I want to build it to take whatever people want to put on 
  it.Scott Reed wrote: 
  
Only 
a CPE today, but towers always beg for more equipment. Don't skimp, you 
never know what you will want/need in the future. Scott Reed 
Owner NewWays Wireless Networking Network Design, 
Installation and Administration www.nwwnet.net -- Original Message 
--- From: Brian Rohrbacher <[EMAIL PROTECTED]> 
To: WISPA General List  Sent: 
Mon, 22 Aug 2005 08:34:03 -0400 Subject: Re: [WISPA] Rohn BX Tower 
> Portland cement has no gravel.  I'll mix it 4 parts to 
one.  So.those 15 94 lb bags are like 60 94 lb bags.  I had 
figured I needed 1.28 yards for the hole I dug.  But now that I have 
the specs I will see how big the hole has to be.  I will only put a CPE 
on this tower.  Nothing huge. > > Brian > > 
Mark Koskenmaki wrote: 
15 bags of cement won't mean squat in a hole that 

big.









North East Oregon Fastnet, LLC 

509-593-4061

personal correspondence to:  mark at neofast dot 

net

sales inquiries to:  purchasing at neofast dot 

net

Fast Internet, NO 

WIRES!



-

- Original Message - 



From: "Brian Rohrbacher" <[EMAIL PROTECTED]>
To: 
Sent: Sunday, August 21, 2005 7:21 
PM
Subject: [WISPA] Rohn BX 
Tower

  

  I dug a hole 32 inch square by 42 inches deep yesterday for a 

rohn 

bx

tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland 

cement



  and will add my own 

gravel.

  


  I was thinking about three 1 1/2 inch pieces of pipe stuck in 

the 

concrete



  to bolt the tower legs to.  I 

will

  


  thread and put couplers on the pipe at 22 inches so they can't 

move.  

I've



  got some re-bar to chuck down in the hole 

too.

  


  I've got 3 8ft ground rods and will bond with #4 bare stranded 

wire.  

I



  picked up a load of grade 8 

bolts,

  


  washers, and lock washers for bolting the tower together and to 

the 

pipe



  stubs.  Anyone have any 

suggestions

  


  for me?  This is my first tower.  I will pour tomorrow 

afternoon.



brian





-- 



WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/



--- End of Original Message --- 

No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 8/19/2005
  
-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-22 Thread Rob's list



boy are we lucky out here in rural america.  I 
can get 1 yard tacked on to someone elses load for the regular per yard 
price.  but its like that in a small town
 
rob

  - Original Message - 
  From: 
  Tom 
  DeReggi 
  To: WISPA General List 
  Sent: Monday, August 22, 2005 10:52 
  AM
  Subject: Re: [WISPA] Rohn BX Tower
  
  >I think you have to get something like 7 yards to avoid all the 
  charges and fees for the truck.  
   
  Yeah, but bad back for the month, costs more. 
  :-(
   
  Tom DeReggiRapidDSL & Wireless, Inc
   
  IntAirNet- Fixed Wireless Broadband
  
- Original Message - 
From: 
Brian 
Rohrbacher 
To: WISPA General List 
Sent: Monday, August 22, 2005 1:13 
AM
Subject: Re: [WISPA] Rohn BX 
Tower
I think you have to get something like 7 yards to avoid all 
the charges and fees for the truck.  I guess I'll let you guys know in 
2 months how it went.  My brother does concrete for a living, so I hope 
to cut it down to 1 month because I have a "pro" working for me.  
:)JohnnyO wrote: 
2ft wide x 4ft long x 4ft deep There you go !

You will need 2.4cubic yards of concrete - which means - approx 220 80lb
sacks of ready mix - Call in a cement truck for this... You'll be mixing
for 2 months by hand :)

JohnnyO

-Original Message-
From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED]] On
Behalf Of Brian Rohrbacher
Sent: Sunday, August 21, 2005 11:58 PM
To: WISPA General List
Subject: Re: [WISPA] Rohn BX Tower


Found it.  But now I don't understand exactly how big my hole needs to
be.

http://www.wb0w.com/shelby/BXCBS1.htm

Brian Rohrbacher wrote:

  
  As close as I get is the info on page 9 and 10.  All I want is the
dumb thing to say "dig a hole this by this for a 40 footer."  I still 
have no idea how big of a hole I need.


A. Huppenthal wrote:


The trouble with mixing your own cement is that there's *never*
really enough. Do a 4 x 4 foot pad that's 5 feet deep and you've got 
lots of concrete. If a cement truck is not an option, rent a mixer. 
Don't skimp on the plug, it's really hard to add concrete later.. :-)


Brian Rohrbacher wrote:

  
  That one has 7 sections and mine has 5.  I never found the specs for
base.  I'll keep looking.

Lonnie Nunweiler wrote:


http://bold98.org/gallery/ProjectsTower

Please read this and the manual from the site.  You do not have 
nearly enough concrete for the base.

Lonnie

On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
 

  
  I dug a hole 32 inch square by 42 inches deep yesterday for a rohn

  
  

  

  bx tower.  It is 5 sections of 8 ft.  I just got 15 bags of 
portland cement and will add my own gravel. I was thinking about 
three 1 1/2 inch pieces of pipe stuck in the concrete to bolt the 
tower legs to.  I will thread and put couplers on the pipe at 22 
inches so they can't move.  I've got some re-bar to chuck down in 
the hole too. I've got 3 8ft ground rods and will bond with #4 
bare stranded wire.  I picked up a load of grade 8 bolts,
washers, and lock washers for bolting the tower together and to 
the pipe stubs.  Anyone have any suggestions
for me?  This is my first tower.  I will pour tomorrow afternoon.

brian


--
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe: 
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

  

 

  



-- WISPA Wireless List: 
wireless@wispa.orgSubscribe/Unsubscribe:http://lists.wispa.org/mailman/listinfo/wirelessArchives: 
http://lists.wispa.org/pipermail/wireless/



No virus found in this incoming message.Checked by AVG 
Anti-Virus.Version: 7.0.338 / Virus Database: 267.10.13/78 - Release 
Date: 8/19/2005
  
  

  -- WISPA Wireless List: 
  wireless@wispa.orgSubscribe/Unsubscribe:http://lists.wispa.org/mailman/listinfo/wirelessArchives: 
  http://lists.wispa.org/pipermail/wireless/
  
  

  No virus found in this incoming message.Checked by AVG 
  Anti-Virus.Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 
  8/19/2005
-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-22 Thread Tom DeReggi



>I think you have to get something like 7 yards to avoid all the charges 
and fees for the truck.  
 
Yeah, but bad back for the month, costs more. 
:-(
 
Tom DeReggiRapidDSL & Wireless, Inc
 
IntAirNet- Fixed Wireless Broadband

  - Original Message - 
  From: 
  Brian 
  Rohrbacher 
  To: WISPA General List 
  Sent: Monday, August 22, 2005 1:13 
  AM
  Subject: Re: [WISPA] Rohn BX Tower
  I think you have to get something like 7 yards to avoid all the 
  charges and fees for the truck.  I guess I'll let you guys know in 2 
  months how it went.  My brother does concrete for a living, so I hope to 
  cut it down to 1 month because I have a "pro" working for me.  
  :)JohnnyO wrote: 
  2ft wide x 4ft long x 4ft deep There you go !

You will need 2.4cubic yards of concrete - which means - approx 220 80lb
sacks of ready mix - Call in a cement truck for this... You'll be mixing
for 2 months by hand :)

JohnnyO

-Original Message-
From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED]] On
Behalf Of Brian Rohrbacher
Sent: Sunday, August 21, 2005 11:58 PM
To: WISPA General List
Subject: Re: [WISPA] Rohn BX Tower


Found it.  But now I don't understand exactly how big my hole needs to
be.

http://www.wb0w.com/shelby/BXCBS1.htm

Brian Rohrbacher wrote:

  
As close as I get is the info on page 9 and 10.  All I want is the
dumb thing to say "dig a hole this by this for a 40 footer."  I still 
have no idea how big of a hole I need.


A. Huppenthal wrote:


  The trouble with mixing your own cement is that there's *never*
really enough. Do a 4 x 4 foot pad that's 5 feet deep and you've got 
lots of concrete. If a cement truck is not an option, rent a mixer. 
Don't skimp on the plug, it's really hard to add concrete later.. :-)


Brian Rohrbacher wrote:

  
That one has 7 sections and mine has 5.  I never found the specs for
base.  I'll keep looking.

Lonnie Nunweiler wrote:


  http://bold98.org/gallery/ProjectsTower

Please read this and the manual from the site.  You do not have 
nearly enough concrete for the base.

Lonnie

On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
 

  
I dug a hole 32 inch square by 42 inches deep yesterday for a rohn

  

  

  
bx tower.  It is 5 sections of 8 ft.  I just got 15 bags of 
portland cement and will add my own gravel. I was thinking about 
three 1 1/2 inch pieces of pipe stuck in the concrete to bolt the 
tower legs to.  I will thread and put couplers on the pipe at 22 
inches so they can't move.  I've got some re-bar to chuck down in 
the hole too. I've got 3 8ft ground rods and will bond with #4 
bare stranded wire.  I picked up a load of grade 8 bolts,
washers, and lock washers for bolting the tower together and to 
the pipe stubs.  Anyone have any suggestions
for me?  This is my first tower.  I will pour tomorrow afternoon.

brian


--
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe: 
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

  


 

  
  
  

  -- WISPA Wireless List: 
  wireless@wispa.orgSubscribe/Unsubscribe:http://lists.wispa.org/mailman/listinfo/wirelessArchives: 
  http://lists.wispa.org/pipermail/wireless/
  
  

  No virus found in this incoming message.Checked by AVG 
  Anti-Virus.Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 
  8/19/2005
-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


RE: [WISPA] Rohn BX Tower

2005-08-22 Thread Jeff Mabry








Brian – 

 

What section number will be your
bottom?  If you are using Section # 8 as the bottom then you need to use
the foundation pad recommendations for Section 8.  If so, then you are
looking to excavate for a foundation that is 5 ft 9 inches by 5 ft 9 inches and
4 ft deep.  Spec’s call for 4.9 yards of concrete at 3000 psi. 
They also call for #3 rebar – top & bottom – on 12 inch centers.

 

Whatever section it is use the recommended
foundation specifications.  

 

I would recommend using the concrete base
stub to attach to the tower legs.  See page 10.

 

Best regards,

 





Jeff













From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf
Of Brian Rohrbacher
Sent: Monday, August 22, 2005 7:34
AM
To: WISPA
 General List
Subject: Re: [WISPA] Rohn BX Tower



 

Portland cement has no gravel.  I'll mix it 4
parts to one.  So.those 15 94 lb bags are like 60 94 lb bags.  I
had figured I needed 1.28 yards for the hole I dug.  But now that I have
the specs I will see how big the hole has to be.  I will only put a CPE on
this tower.  Nothing huge.

Brian

Mark Koskenmaki wrote: 

15 bags of cement won't mean squat in a hole that big.North East Oregon Fastnet, LLC 509-593-4061personal correspondence to:  mark at neofast dot netsales inquiries to:  purchasing at neofast dot netFast Internet, NO WIRES!-- Original Message - From: "Brian Rohrbacher" <[EMAIL PROTECTED]>To: Sent: Sunday, August 21, 2005 7:21 PMSubject: [WISPA] Rohn BX Tower    

I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bxtower.  It is 5 sections of 8 ft.  I just got 15 bags of portland cement    

and will add my own gravel.  

I was thinking about three 1 1/2 inch pieces of pipe stuck in the concrete    

to bolt the tower legs to.  I will  

thread and put couplers on the pipe at 22 inches so they can't move.  I've    

got some re-bar to chuck down in the hole too.  

I've got 3 8ft ground rods and will bond with #4 bare stranded wire.  I    

picked up a load of grade 8 bolts,  

washers, and lock washers for bolting the tower together and to the pipe    

stubs.  Anyone have any suggestions  

for me?  This is my first tower.  I will pour tomorrow afternoon. brian  -- WISPA Wireless List: wireless@wispa.org Subscribe/Unsubscribe:http://lists.wispa.org/mailman/listinfo/wireless Archives: http://lists.wispa.org/pipermail/wireless/    

   




-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-22 Thread Brian Rohrbacher




I know.  On one hand I want it good enough for a CPE, but on the other
hand I don't want to hear on the news 20 years from now that it crashed
over and killed a guy when he wanted to put his VW Bug on top of it.  I
want to build it to take whatever people want to put on it.

Scott Reed wrote:

  
  
  Only a CPE today, but towers always beg for more
equipment. Don't skimp, you never know what you will want/need in the
future.
  
  
Scott Reed 
Owner 
NewWays 
Wireless Networking 
Network Design, Installation and Administration 
  www.nwwnet.net
  
  
  -- Original Message ---
  
From: Brian Rohrbacher <[EMAIL PROTECTED]> 
To: WISPA General List  
Sent: Mon, 22 Aug 2005 08:34:03 -0400 
Subject: Re: [WISPA] Rohn BX Tower 
  
> Portland cement has no gravel.  I'll mix it 4 parts to one. 
So.those 15 94 lb bags are like 60 94 lb bags.  I had figured I
needed 1.28 yards for the hole I dug.  But now that I have the specs I
will see how big the hole has to be.  I will only put a CPE on this
tower.  Nothing huge.
  
> 
> Brian
  
> 
> Mark Koskenmaki wrote:
  
15 bags of cement won't mean squat in a hole that 

big.









North East Oregon Fastnet, LLC 

509-593-4061

personal correspondence to:  mark at neofast dot 

net

sales inquiries to:  purchasing at neofast dot 

net

Fast Internet, NO 

WIRES!



-

- Original Message - 



From: "Brian Rohrbacher" <[EMAIL PROTECTED]>
To: 
Sent: Sunday, August 21, 2005 7:21 
PM
Subject: [WISPA] Rohn BX 
Tower

  


  I dug a hole 32 inch square by 42 inches deep yesterday for a 

rohn 

bx

tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland 

cement



  

and will add my own 

gravel.

  



  I was thinking about three 1 1/2 inch pieces of pipe stuck in 

the 

concrete



  

to bolt the tower legs to.  I 

will

  



  thread and put couplers on the pipe at 22 inches so they can't 

move.  

I've



  

got some re-bar to chuck down in the hole 

too.

  



  I've got 3 8ft ground rods and will bond with #4 bare stranded 

wire.  

I



  

picked up a load of grade 8 

bolts,

  



  washers, and lock washers for bolting the tower together and to 

the 

pipe



  

stubs.  Anyone have any 

suggestions

  



  for me?  This is my first tower.  I will pour tomorrow 

afternoon.



brian





-- 



WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

  

  


  
  
  --- End of Original Message ---
  
  
  

No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 8/19/2005
  



-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-22 Thread Scott Reed




Only a CPE today, but towers always beg for more equipment. Don't skimp, you never know what you will want/need in the future.

Scott Reed 


Owner 


NewWays 


Wireless Networking 


Network Design, Installation and Administration 


www.nwwnet.net

-- Original Message 
---

From: Brian Rohrbacher <[EMAIL PROTECTED]> 


To: WISPA General List  


Sent: Mon, 22 Aug 2005 08:34:03 -0400 


Subject: Re: [WISPA] Rohn BX Tower 



> 

Portland cement has no gravel.  I'll mix it 4 parts to one. 

So.those 15 94 lb bags are like 60 94 lb bags.  I had figured 
I
needed 1.28 yards for the hole I dug.  But now that I have the specs 
I
will see how big the hole has to be.  I will only put a CPE on 
this
tower.  Nothing huge.
> 
> 

Brian
> 
> 

Mark Koskenmaki 
wrote:

  
15 bags of cement won't mean squat in a hole that 
big.




North East Oregon Fastnet, LLC 
509-593-4061
personal correspondence to:  mark at neofast dot 
net
sales inquiries to:  purchasing at neofast dot 
net
Fast Internet, NO 
WIRES!

-
- Original Message - 

From: "Brian Rohrbacher" <[EMAIL PROTECTED]>
To: 
Sent: Sunday, August 21, 2005 7:21 
PM
Subject: [WISPA] Rohn BX 
Tower

  

  

I dug a hole 32 inch square by 42 inches deep yesterday for a 
rohn 
bx
tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland 
cement


  

  
and will add my own 
gravel.
  

  

I was thinking about three 1 1/2 inch pieces of pipe stuck in 
the 
concrete


  

  
to bolt the tower legs to.  I 
will
  

  

thread and put couplers on the pipe at 22 inches so they can't 
move.  
I've


  

  
got some re-bar to chuck down in the hole 
too.
  

  

I've got 3 8ft ground rods and will bond with #4 bare stranded 
wire.  
I


  

  
picked up a load of grade 8 
bolts,
  

  

washers, and lock washers for bolting the tower together and to 
the 
pipe


  

  
stubs.  Anyone have any 
suggestions
  

  

for me?  This is my first tower.  I will pour tomorrow 
afternoon.

brian


-- 

WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


  

  
  



--- End of Original Message 
---






-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-22 Thread Brian Rohrbacher




Ya, I finally understood the diagram.  I have to calculate my "w", "x",
and  "d" to figure the base.  http://www.wb0w.com/shelby/BXCBS1.htm

Brian

Scott Reed wrote:

  
  
  I think folks have pretty much taken care of the base
issue.  
I beleive the recommendations for grounding are to use solid wire, not
stranded.  If you can, use #2 or larger.  The goal with grounding, if
it is for lightning protection, is to get the lowest impedance possible
to ground.  Spread the ground rods out as much as you can.  Connect
them each to the tower AND to each other.  Pick a point in that that is
your ground point and make sure everything connects to that one point.
  
  
For more information on grounding, see: 
  http://www.dslreports.com/forum/remark,13235689~mode=flat~days=
Not completely about grounding, but lots of helpful info.
  
  http://www.dslreports.com/forum/remark,13978705
Includes some good diagrams.
  
  http://www.startawisp.com/content/category/8/79/58/
A collection of grounding tips.
  
  
Scott Reed 
Owner 
NewWays 
Wireless Networking 
Network Design, Installation and Administration 
  www.nwwnet.net
  
  
  -- Original Message ---
  
From: Brian Rohrbacher <[EMAIL PROTECTED]> 
To: wireless@wispa.org 
Sent: Sun, 21 Aug 2005 22:21:37 -0400 
Subject: [WISPA] Rohn BX Tower 
  
> I dug a hole 32 inch square by 42 inches deep yesterday for a rohn
bx 
> tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland
cement and will add my own gravel.   
> I was thinking about three 1 1/2 inch pieces of pipe stuck in the
concrete to bolt the tower legs to.  I will 
> thread and put couplers on the pipe at 22 inches so they can't
move.  I've got some re-bar to chuck down in the hole too. 
> I've got 3 8ft ground rods and will bond with #4 bare stranded
wire.  I picked up a load of grade 8 bolts, 
> washers, and lock washers for bolting the tower together and to
the pipe stubs.  
Anyone have any suggestions 
> for me?  This is my first tower.  I will pour tomorrow afternoon. 
> 
> brian 
> 
> -- 
> WISPA Wireless List: wireless@wispa.org 
> 
> Subscribe/Unsubscribe: 
> http://lists.wispa.org/mailman/listinfo/wireless
  
> 
> Archives: http://lists.wispa.org/pipermail/wireless/
  
  --- End of Original Message ---
  
  
  

No virus found in this incoming message.
Checked by AVG Anti-Virus.
Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 8/19/2005
  



-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-22 Thread Brian Rohrbacher




Portland cement has no gravel.  I'll mix it 4 parts to one. 
So.those 15 94 lb bags are like 60 94 lb bags.  I had figured I
needed 1.28 yards for the hole I dug.  But now that I have the specs I
will see how big the hole has to be.  I will only put a CPE on this
tower.  Nothing huge.

Brian

Mark Koskenmaki wrote:

  15 bags of cement won't mean squat in a hole that big.




North East Oregon Fastnet, LLC 509-593-4061
personal correspondence to:  mark at neofast dot net
sales inquiries to:  purchasing at neofast dot net
Fast Internet, NO WIRES!

-
- Original Message - 
From: "Brian Rohrbacher" <[EMAIL PROTECTED]>
To: 
Sent: Sunday, August 21, 2005 7:21 PM
Subject: [WISPA] Rohn BX Tower


  
  
I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bx
tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland cement

  
  and will add my own gravel.
  
  
I was thinking about three 1 1/2 inch pieces of pipe stuck in the concrete

  
  to bolt the tower legs to.  I will
  
  
thread and put couplers on the pipe at 22 inches so they can't move.  I've

  
  got some re-bar to chuck down in the hole too.
  
  
I've got 3 8ft ground rods and will bond with #4 bare stranded wire.  I

  
  picked up a load of grade 8 bolts,
  
  
washers, and lock washers for bolting the tower together and to the pipe

  
  stubs.  Anyone have any suggestions
  
  
for me?  This is my first tower.  I will pour tomorrow afternoon.

brian


-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

  
  
  



-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-22 Thread Scott Reed




I think folks have pretty much taken care of the base issue.  
I beleive the recommendations for grounding are to use solid wire, not stranded.  If you can, use #2 or larger.  The goal with grounding, if it is for lightning protection, is to get the lowest impedance possible to ground.  Spread the ground rods out as much as you can.  Connect them each to the tower AND to each other.  Pick a point in that that is your ground point and make sure everything connects to that one point.

For more information on grounding, see: 
http://www.dslreports.com/forum/remark,13235689~mode=flat~days= Not completely about grounding, but lots of helpful info.
http://www.dslreports.com/forum/remark,13978705 Includes some good diagrams.
http://www.startawisp.com/content/category/8/79/58/ A collection of grounding tips.

Scott Reed 


Owner 


NewWays 


Wireless Networking 


Network Design, Installation and Administration 


www.nwwnet.net

-- Original Message 
---

From: Brian Rohrbacher <[EMAIL PROTECTED]> 


To: wireless@wispa.org 


Sent: Sun, 21 Aug 2005 22:21:37 -0400 


Subject: [WISPA] Rohn BX Tower 



> 

I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bx  
> 

tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland 
cement and will add my own gravel.   
> 

I was thinking about three 1 1/2 inch pieces of pipe stuck in the concrete to 
bolt the tower legs to.  I will 
> 

thread and put couplers on the pipe at 22 inches so they can't move.  I've 
got some re-bar to chuck down in the hole too. 
> 

I've got 3 8ft ground rods and will bond with #4 bare stranded wire.  I 
picked up a load of grade 8 bolts,  
> 

washers, and lock washers for bolting the tower together and to the pipe stubs.  
Anyone have any suggestions 
> 

for me?  This is my first tower.  I will pour tomorrow afternoon. 

> 
> 

brian 
> 
> 

--  
> 

WISPA Wireless List: wireless@wispa.org 
> 
> 

Subscribe/Unsubscribe: 
> 

http://lists.wispa.org/mailman/listinfo/wireless 
> 

> 

Archives: http://lists.wispa.org/pipermail/wireless/ 
--- 
End of Original Message 
---






-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-21 Thread Mark Koskenmaki
15 bags of cement won't mean squat in a hole that big.




North East Oregon Fastnet, LLC 509-593-4061
personal correspondence to:  mark at neofast dot net
sales inquiries to:  purchasing at neofast dot net
Fast Internet, NO WIRES!

-
- Original Message - 
From: "Brian Rohrbacher" <[EMAIL PROTECTED]>
To: <[EMAIL PROTECTED]>
Sent: Sunday, August 21, 2005 7:21 PM
Subject: [WISPA] Rohn BX Tower


>
> I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bx
> tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland cement
and will add my own gravel.
> I was thinking about three 1 1/2 inch pieces of pipe stuck in the concrete
to bolt the tower legs to.  I will
> thread and put couplers on the pipe at 22 inches so they can't move.  I've
got some re-bar to chuck down in the hole too.
> I've got 3 8ft ground rods and will bond with #4 bare stranded wire.  I
picked up a load of grade 8 bolts,
> washers, and lock washers for bolting the tower together and to the pipe
stubs.  Anyone have any suggestions
> for me?  This is my first tower.  I will pour tomorrow afternoon.
>
> brian
>
>
> -- 
> WISPA Wireless List: [EMAIL PROTECTED]
>
> Subscribe/Unsubscribe:
> http://lists.wispa.org/mailman/listinfo/wireless
>
> Archives: http://lists.wispa.org/pipermail/wireless/

-- 
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-21 Thread Brian Rohrbacher
oops, here is where pages 9 and 10 are.   
http://www.antennasystems.com/bxcatalog.pdf


Brian Rohrbacher wrote:

As close as I get is the info on page 9 and 10.  All I want is the 
dumb thing to say "dig a hole this by this for a 40 footer."  I still 
have no idea how big of a hole I need.



A. Huppenthal wrote:

The trouble with mixing your own cement is that there's *never* 
really enough. Do a 4 x 4 foot pad that's 5 feet deep and you've got 
lots of concrete. If a cement truck is not an option, rent a mixer. 
Don't skimp on the plug, it's really hard to add concrete later.. :-)



Brian Rohrbacher wrote:

That one has 7 sections and mine has 5.  I never found the specs for 
base.  I'll keep looking.


Lonnie Nunweiler wrote:


http://bold98.org/gallery/ProjectsTower

Please read this and the manual from the site.  You do not have nearly
enough concrete for the base.

Lonnie

On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
 


I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bx
tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland 
cement and will add my own gravel.
I was thinking about three 1 1/2 inch pieces of pipe stuck in the 
concrete to bolt the tower legs to.  I will
thread and put couplers on the pipe at 22 inches so they can't 
move.  I've got some re-bar to chuck down in the hole too.
I've got 3 8ft ground rods and will bond with #4 bare stranded 
wire.  I picked up a load of grade 8 bolts,
washers, and lock washers for bolting the tower together and to 
the pipe stubs.  Anyone have any suggestions

for me?  This is my first tower.  I will pour tomorrow afternoon.

brian


--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

  





 




--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-21 Thread Brian Rohrbacher




I think you have to get something like 7 yards to avoid all the charges
and fees for the truck.  I guess I'll let you guys know in 2 months how
it went.  My brother does concrete for a living, so I hope to cut it
down to 1 month because I have a "pro" working for me.  :)

JohnnyO wrote:

  2ft wide x 4ft long x 4ft deep There you go !

You will need 2.4cubic yards of concrete - which means - approx 220 80lb
sacks of ready mix - Call in a cement truck for this... You'll be mixing
for 2 months by hand :)

JohnnyO

-Original Message-
From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED]] On
Behalf Of Brian Rohrbacher
Sent: Sunday, August 21, 2005 11:58 PM
To: WISPA General List
Subject: Re: [WISPA] Rohn BX Tower


Found it.  But now I don't understand exactly how big my hole needs to
be.

http://www.wb0w.com/shelby/BXCBS1.htm

Brian Rohrbacher wrote:

  
  
As close as I get is the info on page 9 and 10.  All I want is the
dumb thing to say "dig a hole this by this for a 40 footer."  I still 
have no idea how big of a hole I need.


A. Huppenthal wrote:



  The trouble with mixing your own cement is that there's *never*
really enough. Do a 4 x 4 foot pad that's 5 feet deep and you've got 
lots of concrete. If a cement truck is not an option, rent a mixer. 
Don't skimp on the plug, it's really hard to add concrete later.. :-)


Brian Rohrbacher wrote:

  
  
That one has 7 sections and mine has 5.  I never found the specs for
base.  I'll keep looking.

Lonnie Nunweiler wrote:



  http://bold98.org/gallery/ProjectsTower

Please read this and the manual from the site.  You do not have 
nearly enough concrete for the base.

Lonnie

On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
 

  
  
I dug a hole 32 inch square by 42 inches deep yesterday for a rohn

  

  

  
  
  
  

  

  
bx tower.  It is 5 sections of 8 ft.  I just got 15 bags of 
portland cement and will add my own gravel. I was thinking about 
three 1 1/2 inch pieces of pipe stuck in the concrete to bolt the 
tower legs to.  I will thread and put couplers on the pipe at 22 
inches so they can't move.  I've got some re-bar to chuck down in 
the hole too. I've got 3 8ft ground rods and will bond with #4 
bare stranded wire.  I picked up a load of grade 8 bolts,
washers, and lock washers for bolting the tower together and to 
the pipe stubs.  Anyone have any suggestions
for me?  This is my first tower.  I will pour tomorrow afternoon.

brian


--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe: 
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

  

  
  


 

  

  

  



-- 
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


RE: [WISPA] Rohn BX Tower

2005-08-21 Thread JohnnyO
2ft wide x 4ft long x 4ft deep There you go !

You will need 2.4cubic yards of concrete - which means - approx 220 80lb
sacks of ready mix - Call in a cement truck for this... You'll be mixing
for 2 months by hand :)

JohnnyO

-Original Message-
From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On
Behalf Of Brian Rohrbacher
Sent: Sunday, August 21, 2005 11:58 PM
To: WISPA General List
Subject: Re: [WISPA] Rohn BX Tower


Found it.  But now I don't understand exactly how big my hole needs to
be.

http://www.wb0w.com/shelby/BXCBS1.htm

Brian Rohrbacher wrote:

> As close as I get is the info on page 9 and 10.  All I want is the
> dumb thing to say "dig a hole this by this for a 40 footer."  I still 
> have no idea how big of a hole I need.
>
>
> A. Huppenthal wrote:
>
>> The trouble with mixing your own cement is that there's *never*
>> really enough. Do a 4 x 4 foot pad that's 5 feet deep and you've got 
>> lots of concrete. If a cement truck is not an option, rent a mixer. 
>> Don't skimp on the plug, it's really hard to add concrete later.. :-)
>>
>>
>> Brian Rohrbacher wrote:
>>
>>> That one has 7 sections and mine has 5.  I never found the specs for
>>> base.  I'll keep looking.
>>>
>>> Lonnie Nunweiler wrote:
>>>
>>>> http://bold98.org/gallery/ProjectsTower
>>>>
>>>> Please read this and the manual from the site.  You do not have 
>>>> nearly enough concrete for the base.
>>>>
>>>> Lonnie
>>>>
>>>> On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
>>>>  
>>>>
>>>>> I dug a hole 32 inch square by 42 inches deep yesterday for a rohn

>>>>> bx tower.  It is 5 sections of 8 ft.  I just got 15 bags of 
>>>>> portland cement and will add my own gravel. I was thinking about 
>>>>> three 1 1/2 inch pieces of pipe stuck in the concrete to bolt the 
>>>>> tower legs to.  I will thread and put couplers on the pipe at 22 
>>>>> inches so they can't move.  I've got some re-bar to chuck down in 
>>>>> the hole too. I've got 3 8ft ground rods and will bond with #4 
>>>>> bare stranded wire.  I picked up a load of grade 8 bolts,
>>>>> washers, and lock washers for bolting the tower together and to 
>>>>> the pipe stubs.  Anyone have any suggestions
>>>>> for me?  This is my first tower.  I will pour tomorrow afternoon.
>>>>>
>>>>> brian
>>>>>
>>>>>
>>>>> --
>>>>> WISPA Wireless List: [EMAIL PROTECTED]
>>>>>
>>>>> Subscribe/Unsubscribe: 
>>>>> http://lists.wispa.org/mailman/listinfo/wireless
>>>>>
>>>>> Archives: http://lists.wispa.org/pipermail/wireless/
>>>>>
>>>>>   
>>>>
>>>>
>>>>
>>>>
>>>>  
>>>>
>>
-- 
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe: http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

-- 
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


RE: [WISPA] Rohn BX Tower

2005-08-21 Thread JohnnyO
The same size as the one for the 70ft Version Brian - That's how large
of a base you need.

JohnnyO

-Original Message-
From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On
Behalf Of Brian Rohrbacher
Sent: Sunday, August 21, 2005 11:53 PM
To: WISPA General List
Subject: Re: [WISPA] Rohn BX Tower


As close as I get is the info on page 9 and 10.  All I want is the dumb 
thing to say "dig a hole this by this for a 40 footer."  I still have no

idea how big of a hole I need.


A. Huppenthal wrote:

> The trouble with mixing your own cement is that there's *never* really
> enough. Do a 4 x 4 foot pad that's 5 feet deep and you've got lots of 
> concrete. If a cement truck is not an option, rent a mixer. Don't 
> skimp on the plug, it's really hard to add concrete later.. :-)
>
>
> Brian Rohrbacher wrote:
>
>> That one has 7 sections and mine has 5.  I never found the specs for
>> base.  I'll keep looking.
>>
>> Lonnie Nunweiler wrote:
>>
>>> http://bold98.org/gallery/ProjectsTower
>>>
>>> Please read this and the manual from the site.  You do not have 
>>> nearly enough concrete for the base.
>>>
>>> Lonnie
>>>
>>> On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
>>>  
>>>
>>>> I dug a hole 32 inch square by 42 inches deep yesterday for a rohn 
>>>> bx tower.  It is 5 sections of 8 ft.  I just got 15 bags of 
>>>> portland cement and will add my own gravel. I was thinking about 
>>>> three 1 1/2 inch pieces of pipe stuck in the concrete to bolt the 
>>>> tower legs to.  I will thread and put couplers on the pipe at 22 
>>>> inches so they can't move.  I've got some re-bar to chuck down in 
>>>> the hole too. I've got 3 8ft ground rods and will bond with #4 bare

>>>> stranded wire.  I picked up a load of grade 8 bolts,
>>>> washers, and lock washers for bolting the tower together and to the

>>>> pipe stubs.  Anyone have any suggestions
>>>> for me?  This is my first tower.  I will pour tomorrow afternoon.
>>>>
>>>> brian
>>>>
>>>>
>>>> --
>>>> WISPA Wireless List: [EMAIL PROTECTED]
>>>>
>>>> Subscribe/Unsubscribe: 
>>>> http://lists.wispa.org/mailman/listinfo/wireless
>>>>
>>>> Archives: http://lists.wispa.org/pipermail/wireless/
>>>>
>>>>   
>>>
>>>
>>>
>>>  
>>>
>
-- 
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe: http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

-- 
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-21 Thread Brian Rohrbacher

Found it.  But now I don't understand exactly how big my hole needs to be.

http://www.wb0w.com/shelby/BXCBS1.htm

Brian Rohrbacher wrote:

As close as I get is the info on page 9 and 10.  All I want is the 
dumb thing to say "dig a hole this by this for a 40 footer."  I still 
have no idea how big of a hole I need.



A. Huppenthal wrote:

The trouble with mixing your own cement is that there's *never* 
really enough. Do a 4 x 4 foot pad that's 5 feet deep and you've got 
lots of concrete. If a cement truck is not an option, rent a mixer. 
Don't skimp on the plug, it's really hard to add concrete later.. :-)



Brian Rohrbacher wrote:

That one has 7 sections and mine has 5.  I never found the specs for 
base.  I'll keep looking.


Lonnie Nunweiler wrote:


http://bold98.org/gallery/ProjectsTower

Please read this and the manual from the site.  You do not have nearly
enough concrete for the base.

Lonnie

On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
 


I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bx
tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland 
cement and will add my own gravel.
I was thinking about three 1 1/2 inch pieces of pipe stuck in the 
concrete to bolt the tower legs to.  I will
thread and put couplers on the pipe at 22 inches so they can't 
move.  I've got some re-bar to chuck down in the hole too.
I've got 3 8ft ground rods and will bond with #4 bare stranded 
wire.  I picked up a load of grade 8 bolts,
washers, and lock washers for bolting the tower together and to 
the pipe stubs.  Anyone have any suggestions

for me?  This is my first tower.  I will pour tomorrow afternoon.

brian


--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

  





 




--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-21 Thread Brian Rohrbacher
As close as I get is the info on page 9 and 10.  All I want is the dumb 
thing to say "dig a hole this by this for a 40 footer."  I still have no 
idea how big of a hole I need.



A. Huppenthal wrote:

The trouble with mixing your own cement is that there's *never* really 
enough. Do a 4 x 4 foot pad that's 5 feet deep and you've got lots of 
concrete. If a cement truck is not an option, rent a mixer. Don't 
skimp on the plug, it's really hard to add concrete later.. :-)



Brian Rohrbacher wrote:

That one has 7 sections and mine has 5.  I never found the specs for 
base.  I'll keep looking.


Lonnie Nunweiler wrote:


http://bold98.org/gallery/ProjectsTower

Please read this and the manual from the site.  You do not have nearly
enough concrete for the base.

Lonnie

On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
 


I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bx
tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland 
cement and will add my own gravel.
I was thinking about three 1 1/2 inch pieces of pipe stuck in the 
concrete to bolt the tower legs to.  I will
thread and put couplers on the pipe at 22 inches so they can't 
move.  I've got some re-bar to chuck down in the hole too.
I've got 3 8ft ground rods and will bond with #4 bare stranded 
wire.  I picked up a load of grade 8 bolts,
washers, and lock washers for bolting the tower together and to the 
pipe stubs.  Anyone have any suggestions

for me?  This is my first tower.  I will pour tomorrow afternoon.

brian


--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

  




 




--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-21 Thread A. Huppenthal
The trouble with mixing your own cement is that there's *never* really 
enough. Do a 4 x 4 foot pad that's 5 feet deep and you've got lots of 
concrete. If a cement truck is not an option, rent a mixer. Don't skimp 
on the plug, it's really hard to add concrete later.. :-)



Brian Rohrbacher wrote:

That one has 7 sections and mine has 5.  I never found the specs for 
base.  I'll keep looking.


Lonnie Nunweiler wrote:


http://bold98.org/gallery/ProjectsTower

Please read this and the manual from the site.  You do not have nearly
enough concrete for the base.

Lonnie

On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
 


I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bx
tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland cement and 
will add my own gravel.
I was thinking about three 1 1/2 inch pieces of pipe stuck in the concrete to 
bolt the tower legs to.  I will
thread and put couplers on the pipe at 22 inches so they can't move.  I've got 
some re-bar to chuck down in the hole too.
I've got 3 8ft ground rods and will bond with #4 bare stranded wire.  I picked 
up a load of grade 8 bolts,
washers, and lock washers for bolting the tower together and to the pipe stubs. 
 Anyone have any suggestions
for me?  This is my first tower.  I will pour tomorrow afternoon.

brian


--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

   




 



--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-21 Thread Brian Rohrbacher




That one has 7 sections and mine has 5.  I never found the specs for
base.  I'll keep looking.

Lonnie Nunweiler wrote:

  http://bold98.org/gallery/ProjectsTower

Please read this and the manual from the site.  You do not have nearly
enough concrete for the base.

Lonnie

On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
  
  
I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bx
tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland cement and will add my own gravel.
I was thinking about three 1 1/2 inch pieces of pipe stuck in the concrete to bolt the tower legs to.  I will
thread and put couplers on the pipe at 22 inches so they can't move.  I've got some re-bar to chuck down in the hole too.
I've got 3 8ft ground rods and will bond with #4 bare stranded wire.  I picked up a load of grade 8 bolts,
washers, and lock washers for bolting the tower together and to the pipe stubs.  Anyone have any suggestions
for me?  This is my first tower.  I will pour tomorrow afternoon.

brian


--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


  
  

  



-- 
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/


Re: [WISPA] Rohn BX Tower

2005-08-21 Thread Lonnie Nunweiler
http://bold98.org/gallery/ProjectsTower

Please read this and the manual from the site.  You do not have nearly
enough concrete for the base.

Lonnie

On 8/21/05, Brian Rohrbacher <[EMAIL PROTECTED]> wrote:
> 
> I dug a hole 32 inch square by 42 inches deep yesterday for a rohn bx
> tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland cement and 
> will add my own gravel.
> I was thinking about three 1 1/2 inch pieces of pipe stuck in the concrete to 
> bolt the tower legs to.  I will
> thread and put couplers on the pipe at 22 inches so they can't move.  I've 
> got some re-bar to chuck down in the hole too.
> I've got 3 8ft ground rods and will bond with #4 bare stranded wire.  I 
> picked up a load of grade 8 bolts,
> washers, and lock washers for bolting the tower together and to the pipe 
> stubs.  Anyone have any suggestions
> for me?  This is my first tower.  I will pour tomorrow afternoon.
> 
> brian
> 
> 
> --
> WISPA Wireless List: [EMAIL PROTECTED]
> 
> Subscribe/Unsubscribe:
> http://lists.wispa.org/mailman/listinfo/wireless
> 
> Archives: http://lists.wispa.org/pipermail/wireless/
> 


-- 
Lonnie Nunweiler
Valemount Networks Corporation
http://www.star-os.com/
--
WISPA Wireless List: [EMAIL PROTECTED]

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/