RE: [Axapta-Knowledge-Village] Lead Time in planning for Scheduling of operations

2008-04-01 Thread Anders Sorensen
Hi, If the Finite material checkbox is selected, then it means that an explosion is run on the production before performing the job scheduling. If the sub components of the production BOM are all on hand then it has no impact on the scheduling, but if some items are not on hand and a planned

Re: [Axapta-Knowledge-Village] Lead Time in planning for Scheduling of operations

2008-04-01 Thread visti Sethna
Will this also consider the lead time of the Items as specified for the item type / service type items in the item master. Say if i have an item X of type item that is required and is not avialabe will the lead time be considered On Tue, Apr 1, 2008 at 12:56 PM, Anders Sorensen [EMAIL PROTECTED]

RE: [Axapta-Knowledge-Village] Lead Time in planning for Scheduling of operations

2008-04-01 Thread Anders Sorensen
If the items of type Item are not on hand then a planned Purchase order will be generated and if the item has a lead time then it will get a futures date which will be considered by production scheduling. Regards, Anders This posting is provided AS IS with no warranties, and confers no

Re: [Axapta-Knowledge-Village] Lead Time in planning for Scheduling of operations

2008-04-01 Thread Tushar Joshi
Can u please guide me in mapping Sub contracting process in Ax. I have a client who follows sub-contracting process in which the material from his own inventory are sent to vendor for job-work and then the material in inwarded with a different item number. E.g. I have a sub assemly

RE: [Axapta-Knowledge-Village] Lead Time in planning for Scheduling of operations

2008-03-31 Thread Anders Sorensen
The checkbox for finite material can be found on the General tab of Job Scheduling or Operation Scheduling forms (Production - Production orders - Update - Job scheduling). Regards, Anders Sorensen This posting is provided AS IS with no warranties, and confers no rights. From:

Re: [Axapta-Knowledge-Village] Lead Time in planning for Scheduling of operations

2008-03-31 Thread visti Sethna
Sir can you tell me what are the effects of ticking the finite material checkbox. and what will the implications be. Reply ASAP Regards Visti On Mon, Mar 31, 2008 at 7:28 PM, Anders Sorensen [EMAIL PROTECTED] wrote: The checkbox for finite material can be found on the General tab of Job