Can u please guide me in mapping Sub contracting process in Ax.
   
  I have a client who follows sub-contracting process in which the material 
from his own inventory are sent to vendor for job-work and then the material in 
inwarded with a different item number.
   
  E.g. I have a sub assemly named A for which i have a BOM and the components 
are C and D. I will send the material C and D to my vendor and in turn he will 
return me item A.
   
  -Tushar

visti Sethna <[EMAIL PROTECTED]> wrote:
            Can someone tell me how will the time be captured for the 
subcontracting (Service type) item please. Coz My gant chart should capture the 
lead time for procurement of the subcontracted item when I schedule  the jobs. 
Instead, it schedules the first operation instantly after the second operation. 
There is something called finite material and finite capacity planing. Where do 
i select the checkbox for finite material planning. 
   
  Please suggest.


-- 
With Regards,
Mr. Vishtaspa Sethna 
Associate E.R.P. Consultant
Godrej Infotech Ltd. 
Cell: +919718010823 
  

                           

       
---------------------------------