Dear All,
Thank you very much for many members who has replied online and offline. I
value your expert comments. So far, I have learned that antenna's VSWR, cable
loss (at high frequency), and 80% AM modulation are the factors to count on.
The new requirements from the third edition of
Hi Michael,
An English version is available at
http://www.graspllc.com/China_RoHS_Common_Q_A.php. Please note this is not an
official translation. This translation is for informational purpose, not for
legal advise.
Enjoy!
Warmest regards,
Grace
On 6/8/06, M. Loerzer-Mobile
Chris,
Apologies for taking so long to answer this e-mail, but I got so buried last
week I didn't have much of a chance to check this list.
Regarding Schematic Layout packages, I don't know much about Proteus.
However, John Woodgate was pretty accurate when he said that for schematic
layout
Hello
as all things said below, there is one more item to be added.
The formula is right for the power deliver to the antenna terminal and the
field probe sitting direct opposite the transmitting antenna with not influence
due to the chamber and antenna polarisaton and free space conditons.
HI Mac
I have one here that could be rented...
Derek Walton
- This
message is from the IEEE Product Safety Engineering Society emc-pstc
discussion list. Website: http://www.ieee-pses.org/
To post a message to the list, send
Esteemed Colleagues,
Motorola ECC in Marlborough, MA has a contract position
(~ 3 months) open for a Hardware Verification Engineer. This could turn into
a full-time position for the right candidate at the right time. As many of
the compliance engineers I have met seem to have
Hello group,
Does anyone out there know of a source for leasing / renting FM 5004 field
monitors? We are trying to identify a source for backup equipment.
Any leads would be greatly appreciated.
Best regards,
Mac Elliott
-
In message 20060612151511.73191.qm...@web55512.mail.re4.yahoo.com,
dated Mon, 12 Jun 2006, Andy Garcia arg...@yahoo.com writes
It has always been my understanding that WEEE labeling is required on
devices, instruments, apparatus, what have you, but not on any of the
sub-assemblies or specific
Hello everyone,
It has always been my understanding that WEEE labeling is required on devices,
instruments, apparatus, what have you, but not on any of the sub-assemblies or
specific components.
I am now told that entities in Europe are requiring that items such as
detachable power cords also
Hello everyone,
It has always been my understanding that WEEE labeling is required on devices,
instruments, apparatus, what have you, but not on any of the sub-assemblies or
specific components.
I am now told that entities in Europe are requiring that items such as
detachable power cords also
Mike,
The room always had a green wire ground where ac mains came into the room
through the filter panel. That was a single-point reference to the water
pipes, for safety and also didn't pollute my room for an RE01 type
measurement. But that was a very long ground path, no good at all at rf. I
In message 17191.81.86.19.62.1150098003.squir...@www.kcchosting.co.uk,
dated Mon, 12 Jun 2006, Charles Blackham
charles.black...@sulisconsultants.com writes
However as Point-of-Sale equipment is not typically domestic equipment,
if you can state categorically that this is the case, you could
Jeff,
I examined some metalised fabric for screening purposes some time ago.
The screening it offered was never as good as the manufacturers numbers
suggested it would be. After the material had been folded a couple of times,
the metallisation started to break up and the screening (what there
In message
1f928cef5baeeb4cba0364fa52f536ad01234...@tmo-msxvs01.thermo.com, dated
Mon, 12 Jun 2006, Hopkins, Michael J. michael.hopk...@thermo.com
writes
Ken -- I hope your ground rod was bonded to building ground!!
That doesn't necessarily apply in UK, although in this case, the 'mains
Ken -- I hope your ground rod was bonded to building ground!!
Best Regards,
Michael Hopkins
Manager, Customer Technical Center
Process Instruments Division
Thermo Electron Corporation
One Lowell Research Center
Lowell, MA 01852
Tel: +1 978 275 0800 Main
+1 978 235 9334 Direct
15 matches
Mail list logo