Good afternoon all:

Got a question regarding pipe stands, NFPA 13 2007 Section 9.2.6 is a new
requirement for sizing stands relating to riser headers.  We have an AHJ in
our area that would like to see proof that the stands are sufficient.  If I
go back to my Statics and Strength of Materials books and look at Column
Analysis no problem, however what about Joe Contractor that has never been
exposed to this analysis?  For those on this forum that are on 13's Hanging
Committee - is this really the intent of 9.2.6?  

 

Jim Johnston, P.E.

Fire Protection Engineer

Inland Fire Protection, Inc

1100 Ahtanum Road

Yakima, WA 98903

Phone 509-248-4471

Fax 509-248-1180

[email protected]

 