I am bidding on removal and replacement of an existing dry pipe system. This is 
about 1,000 feet of 3 inch. Part of the specification is “Contractor shall 
submit working plans that have been approved by authorities having 
jurisdiction, including hydraulic calculations, prior to starting work.”

Is it normal to have new calculations done when just replacing rusting pipes?  
If so, where do you draw the line at needing new calculations?  There has been  
new construction,  since the building was built.  Three new low hazard 
buildings have been built, with a  new low hazard rehabilitation facility going 
in a block down the street.  