At what point does a stage become a stage rather than just a raised
platform? 

I am working on a project that is an old school that is being converted to
apartments, however a portion of the building will remain as an educational
classification with a school "stage" in the gymnasium portion of the
building.

Should I be looking at this as a full blown "stage" and all of the hose
stations and such or am I over thinking? I am trying to eliminate the need
for a fire pump. 

No, I can't ask the engineer. we basically got an x through the drawings and
says provide fire protection to meet code. 

Thanks


Craig Leadbetter

Safeguard of Marquette
PO Box 116
Marquette, MI 49855


(P) 906-475-9955
(F) 906-475-5474
(C) 906-362-5393







_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to