Rick Matsuda is correct that each jurisdiction will address this
differently, depending on how they approach their high rise evolution.  You
think 100 psi is tough, a local AHJ has amended IFC 905.3.9 to require "150
psi while flowing 300 gpm". Where a PRV is installed, a non-regulated bypass
must also be installed.  

 

 

Travis E. Allen, p.E.            

Sr. Fire Protection Engineer

AEGIS Engineering, PLLC

13024 Beverly Park Rd, Ste 202 , Mukilteo, WA  98275

O: 425.745.4700  | F: 206.801.5797

 <http://www.aegisengineering.com/> www.AEGISengineering.com

This e-mail and any attachments may contain confidential and/or privileged
information.  If you are not the intended recipient, please notify the
sender immediately and do not copy, distribute, use or retain this
information or transmission.

 

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to