I would surmise that the 8 foot minimum distance is to prevent 'cold soldering'. The I-beam pockets preclude this from happening, therefore this restriction is non applicable to the design problem.
John R. O’Connor, SET, RME National Fire Sprinklers, Inc. 2601 Elm Hill Pike, Suite J Nashville TN 37214 Office 615-885-1301 Fax 615-885-7505 Cell 615-519-1118 jocon...@nfspk.com In God We Trust -----Original Message----- From: Sprinklerforum <sprinklerforum-boun...@lists.firesprinkler.org> On Behalf Of Travis Mack via Sprinklerforum Sent: Tuesday, October 6, 2020 2:56 PM To: sprinklerforum@lists.firesprinkler.org Cc: travis.m...@mfpdesign.com; jcrawf...@phaserfire.ca Subject: RE: ESFR and Obstructed Construction I was under the impression you still have to maintain 8' minimum between sprinklers, even if you are in every beam pocket. This building may not be suitable for ESFR. Travis Mack, CFPS, CWBSP, RME-G, SET Engineering Manager MFP Design 3356 E Vallejo Ct Gilbert, AZ 85298 NEW EXTENSION: 480-505-9271 ext. 700 NEW MOBILE: 480-272-2471 mailto:travis.m...@mfpdesign.com www.mfpdesign.com Send large files to us via: https://na01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.hightail.com%2Fu%2FMFPDesign&data=02%7C01%7C%7C1121d49f9e6b4cf248f108d4df580e77%7C14e5497c16da42e69ffa77d19bafe511%7C0%7C0%7C636379016677342180&sdata=eGdMZGu2wXhUupGwgGTrqF3b54OP5%2BAZvlHhABSexWY%3D&reserved=0 LinkedIn: https://na01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fin%2Ftravismack&data=02%7C01%7C%7C1121d49f9e6b4cf248f108d4df580e77%7C14e5497c16da42e69ffa77d19bafe511%7C0%7C0%7C636379016677342180&sdata=tT5E7LsZjSmyreKi4gDCa70EWN%2BZodi%2FhbeCbHNRijI%3D&reserved=0 “The bitterness of poor quality remains long after the sweetness of low price is forgotten.” Need/Want a faster way to check material pricing? Build a material quote? Check availability ? Searching for an invoice? *If you do not already have an account with ferguson.com, click https://www.ferguson.com/account-registration to register.* **Have a Ferguson account? Download the Ferguson app for on-the-go access to your favorite ferguson.com features. http://fergusoncommunications.us.newsweaver.com/hq7bgesq7f/1qtklpp37l9byeftyuoy12/external?email=true&a=6&p=2591775&t=517003 or http://fergusoncommunications.us.newsweaver.com/hq7bgesq7f/n1gewi5ud95byeftyuoy12/external?email=true&a=6&p=2591775&t=517003** From: Sprinklerforum <sprinklerforum-boun...@lists.firesprinkler.org> On Behalf Of James Crawford via Sprinklerforum Sent: Tuesday, October 6, 2020 12:54 PM To: sprinklerforum@lists.firesprinkler.org Cc: James Crawford <jcrawf...@phaserfire.ca> Subject: ESFR and Obstructed Construction I am looking at a building 36" high that is using beams for the roof construction, they are spaced at 6'-0" on center and are 24" deep. The sprinkler design is asking for ESFR but I am not sure if this will work, I know we can use ESFR in obstructed construction but my understanding is the heads location still needs to comply with the listing. So based on this I would need a head in every bay created by the beams and the head would need to be 14" or 18" max from the deck. Am I missing something? Thank You James Crawford Phaser Fire Protection Ltd. Phone 604-888-0318 Cel: 604-790-0938 Email mailto:jcrawf...@phaserfire.ca<mailto:jcrawf...@phaserfire.ca> Web: http://www.phaserfire.ca<http://www.phaserfire.ca> _______________________________________________ Sprinklerforum mailing list mailto:Sprinklerforum@lists.firesprinkler.org http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org _______________________________________________ Sprinklerforum mailing list Sprinklerforum@lists.firesprinkler.org http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org _______________________________________________ Sprinklerforum mailing list Sprinklerforum@lists.firesprinkler.org http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org