>From what we have been told, what is being tested now IS a commercial
product, providing heat to a factory and saving the factory owner a
significant amount of money in heating costs.

On Thu, Aug 6, 2015 at 10:45 AM, Orionworks - Steven Vincent Johnson <
orionwo...@charter.net> wrote:

> From Ashfield,
>
>
>
> ...
>
>
>
> > The good news is that Aftenposten, Norway's largest newspaper , has
> reported
>
> > they have expert third party confirmation that Rossi's 1 MW thermal LENR
> plant
>
> > is working well.  It is now at about 168 days of the 350 day trial.
>
> > If, as now looks likely, LENR works, it should solve a lot of problems.
>
>
>
> I must confess that I have been remiss in keeping track of Rossi's 350 day
> 1 MW thermal LENR plant trial. Assuming this latest trial completes and the
> data looks good... what happens next?
>
>
>
> I don't know enough about this latest trial experiment to grok whether the
> engineering & technology involved would be considered reliable enough or
> even sufficiently understood such that the components currently be used
> could presumably be re-engineered into the design of an actual commercial
> product. I may be mistaken on this point, but I'm assuming an attempt to
> design an actual commercial product would be the next logical step -
> perhaps not to private individuals but for some kind of industrial use,
> perhaps for heating large factory buildings cheaply. I'm assuming
> industrial oriented safety restrictions could be better enforced in ways
> that could not easily be done if sold to the private sector.
>
>
>
> Would components from the Vort Collective continuum care to comment?
>
>
>
> Regards,
>
> Steven Vincent Johnson
>
> OrionWorks.com
>
> zazzle.com/orionworks
>



-- 
Frank Acland
Publisher, E-Cat World <http://www.e-catworld.com>

Reply via email to