Andrea Rossi
October 31st, 2011 at 9:12 AM

Dear James Bowery:
The dissipator has been designed by me and the person who leaded the test, an engineer of NATO ( a Colonel) who has 30 years of experience in thermopower plants and thermodynamical systems.
It has been designed to dissipate 4 times the necessary energy. All in the tested plant was redundant: we had 2 power generators, so that if one should fail the second would automatically had been put in operation, we had 4 pumps instead of 2, so that each pump would have a reserve, we had 2 control panels, so that ant electronic shortcoming would have been overcome by a reserve, etc: I simply could not fail, so we foresaw any possibility of failure and prepared a back up for any of it. The day before I wrote in this blog “we are ready”: when we say a thing you can bet on it.
Warm Regards,
A.R.
Andrea Rossi
October 31st, 2011 at 9:01 AM

Dear Manik Sahai:
We have started the manufacturing of 1 MW plants. Who wants to buy them whatever its Nation, can contact us at: i...@leonardocorp1996.com
Warm Regards,
A.R.