Thanks, that sounds thorough
From: blindhandyman@yahoogroups.com [mailto:blindhandy...@yahoogroups.com] On Behalf Of Michael baldwin Sent: Wednesday, May 19, 2010 11:36 AM To: blindhandyman@yahoogroups.com Subject: RE: [BlindHandyMan] Putting in a basement floor Well, here is my $0.02 on the topic. Figure out what you want the finished height of the floor to be and excavate as needed. Lot of work. 5 gallon buckets of dirt out of a basement is not fun, I know from experience. 6 mil plastic on the dirt, and up the edges a few inches, using caulk to seal, and hold the plastic up on the wall. 2x6 treated boards fastened to the sides of the concrete as ledger boards. I would use construction adhesive, and tapcons. 2x6 joists to span across and installed with joist hangers. top with 3/4 T&G exterior grade plywood. Won't need footings, but this assumes that there is concrete on all four sides of your hole. Michael [Non-text portions of this message have been removed] [Non-text portions of this message have been removed]