I'm curious about how others are planning their time for the labs.

In reading through the lab, it seems to me that it is best to go through and do 
all the drawings, dial plan design, etc. at the beginning.  This means you 
might be spending a bit more time on it, but in my experience, an hour spent 
planning generally saves two or more.  

I'd be interested to know if other folks are doing their dial plan table at the 
same time they do their drawing of the network, or what.  

Cliff

Reply via email to