HI,

> At the time of the 1.3.0 source release I wasn't prepared to release the
> binaries because I hadn't read enough about the process to do it right. 

IMO I think you should one release with  both the binaries and sources before 
graduation, but other may have differing opinions.

It not immediately obvious to me that the two binaries you have (hourglass and 
pig) relate directly to the source release. I can see that both of them also 
have a source jar inside them [1][2] but each source jar is different and 
possibly different to [3]? That might be considered an unapproved source 
release?

Branding wise your site is missing a few things, including a download section, 
required links and the like [4] but that should be easily fixed.

Thanks,
Justin

1. 
https://repository.apache.org/content/groups/public/org/apache/datafu/datafu-pig-incubating/1.3.1/
2. 
https://repository.apache.org/content/groups/public/org/apache/datafu/datafu-hourglass-incubating/1.3.1/
3. 
http://apache.mirror.amaze.com.au/incubator/datafu/apache-datafu-incubating-1.3.1/
4. http://www.apache.org/foundation/marks/pmcs.html

Reply via email to