Hi, I was a bit confused in terms of setting the ‘fix version’ for JIRAs that are being committed right now. I think it makes sense for the fixVersion to just be 7.0, and nothing else for everything that is going into branch_7_0, instead of being both 7.0, and master (8.0).
Any thoughts? -Anshum
