Hi,
We have the following IBM box :
*IBM z890-2086-A04 Model 6260 with SN 2549A ; with zOS 1.7. in 64 bit
mode ; z990 Exploitation Feature (there are two IFL in this configuration).
We have 5 LPAR's defined on this box and 1 Linux Lpar.
None of these LPAR's are capped and we are running at 150% CPU busy on
the Production Lpar.
Questions :
1. Would these different LPAR's not effect each other
2. Why do I need 2 test LPAR's in this setup
3. Should it not be more beneficial to remove some of these LPAR's. So
instead of 5 , I rather define 3.
Some people are arguing that we should move some of the Test CICS'se ,
off the Prod LPAR and into a Test LPAR. I prefer to run less LPAR's and
keep everything on the Prod Lpar.
What do you think ?
Anton
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html