Hi all, still working on my new layout plan. I've re-drawn it to simplify the 
track plan and eliminate some switches as was suggested by group input and now 
I'm trying to pick some plausible industries for the spurs and develop an 
operating scenario. I've looked at some bing aerial photos to get ideas for 
industries and found some very interesting possibilities, one especially 
surprising was an industry that takes a couple of coil cars at a time into 
their building for unloading. Also found a scrap iron dealer that has a 4 wheel 
diesel critter moving gondolas around. 
  One thing I'm thinking about is the use of a scale on a shortline. Does 
anyone know when a car would be required to be weighed and how it would be 
accomplished on a shortline? Would the shortline need a scale on property or 
could the interchanging class one railroad weigh the cars somewhere down the 
line? Anyone familiar with this? ...Dave Branum 



------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/S-Scale/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/S-Scale/join
    (Yahoo! ID required)

<*> To change settings via email:
    [email protected] 
    [email protected]

<*> To unsubscribe from this group, send an email to:
    [email protected]

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/

Reply via email to